Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20181
Well Classification: GW Status: PA - 1/21/2014
Well Name/No:HSR STREAR #3-10A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/21/2014
FacilityID:258609LocationID:331114
County:WELD #123Location:NENW 10 2N67W 6
Field:WATTENBERG - #90750Elevation:4930 ft.
Planned Location:461FNL  2168 FWLLat/Long: 40.158527 / -104.878253Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.158600 / -104.878090Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/21/2014             Measured TD: 8094 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/21/2014
Wellbore Permit
Permit #:20053966 Expiration Date:11/29/2006
Proposed Depth/Form:8094 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 752 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 570, Top: 0 ft., Bottom: 752 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8058 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 260, Top: 6510 ft., Bottom: 8058 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5392 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 375, Top: 4160 ft., Bottom: 5404 ft.

Wellbore Completed
Completion Date:6/25/2002
Spud Date:6/12/2002Spud Date Is:ACTUAL
Measured TD:8094 ft.Measured PB depth:8044 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDCNGR, DIGLGR, C B L
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 752 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 752 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8058 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 6512 ft., Bottom: 8058 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5392 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 4160 ft., Bottom: 5404 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4463 ft.4571 ft.NN
SHANNON4926 ft.NN
NIOBRARA7228 ft.NN
FORT HAYS7470 ft.NN
CODELL7491 ft.NN
J SAND7932 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/21/2014                 Interval Top: 7936 ft.    Interval Bottom: 7986 ft.

 Completed Information for Formation J SAND
1st Production Date:7/2/2002Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/26/2010
Treatment Summary:SET CIBP@ 7560' W/2 SACKS OF SAND FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT THE CIBP TO COMMINGLE WELL WITHIN THE NEXT SIX MONTHS.
Formation Treatment
Treatment Date:6/25/2002
Treatment Summary:J SAND COMMINGLED W/CODELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 5
CALC_BBLS_OIL 5
CALC_GOR 69200
CALC_MCF_GAS 346
CASING_PRESS 530
GRAVITY_OIL 60
MCF_GAS 346
TUBING_PRESS 325
Perforation Data:
Interval Top:7936 ft.# Of Holes:123
Interval Bottom:7986 ft.Hole Size:0.45 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/21/2014                 Interval Top: 7493 ft.    Interval Bottom: 7514 ft.

 Completed Information for Formation CODELL
1st Production Date:1/12/2006Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/26/2010
Treatment Summary:SET CIBP @ 7560' W2 SACKS OF SAND FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUYT THE CIBP TO COMMINGLE WELL WITHIN THE NEXT SIX MONTHS.
Formation Treatment
Treatment Date:1/11/2006
Treatment Summary:NO ADDITIONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 36
CALC_BBLS_H2O 0
CALC_BBLS_OIL 36
CALC_GOR 3194
CALC_MCF_GAS 115
CASING_PRESS 336
GRAVITY_OIL 46
MCF_GAS 115
TUBING_PRESS 174
Perforation Data:
Interval Top:7493 ft.# Of Holes:63
Interval Bottom:7514 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 1/21/2014                 Interval Top: 7493 ft.    Interval Bottom: 7986 ft.

 Completed Information for Formation J-CODELL
1st Production Date:3/25/2009Choke Size:0.156 in.
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/25/2002
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7899 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/30/2009Test Method:FLOWING
Hours Tested:Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1168
CALC_BBLS_OIL 3
CALC_GOR 21000
CALC_MCF_GAS 63
CASING_PRESS 370
GRAVITY_OIL 49
TUBING_PRESS 310
Perforation Data:
Interval Top:7493 ft.# Of Holes:186
Interval Bottom:7986 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/21/2014                 Interval Top: 7222 ft.    Interval Bottom: 7986 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/14/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/1/2012Treatment End Date:N/A
Treatment Summary:DRILLED OUT CIBP TO COMMINGLE JSND WITH NB/CD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7478 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 3
BTU_GAS 1334
CALC_BBLS_OIL 3
CALC_GOR 6667
CALC_MCF_GAS 18
CASING_PRESS 289
GRAVITY_OIL 49
MCF_GAS 18
TUBING_PRESS 276
Perforation Data:
Interval Top:7222 ft.# Of Holes:258
Interval Bottom:7986 ft.Hole Size:0.375 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/21/2014                 Interval Top: 7222 ft.    Interval Bottom: 7514 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/15/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/28/2013Treatment End Date:N/A
Treatment Summary:DRILLED OUT CIBP TO COMMINGLE JSND WITH NB/CD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7222 ft.# Of Holes:135
Interval Bottom:7514 ft.Hole Size:0.375 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/21/2014                 Interval Top: 7222 ft.    Interval Bottom: 7371 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/11/2010Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2010
Treatment Summary:FRAC NBRR W/500 GAL 15% HC1 & 238,812 GAL SW & 201,740# 30/50 SAND & 4,000# 20/40 SUPERLC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/24/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1185
CALC_GOR 1
CALC_MCF_GAS 10
CASING_PRESS 627
GRAVITY_OIL 48
Perforation Data:
Interval Top:7222 ft.# Of Holes:72
Interval Bottom:7371 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/21/2014
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No