|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/25/2024 Measured TD: 7083 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/25/2024 | | Wellbore Permit | | | Permit #: | 20001179 | Expiration Date: | 10/25/2001 | | Proposed Depth/Form: | 7100 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 10/29/2000 | | Spud Date: | 10/24/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 7083 ft. | Measured PB depth: | 7058 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL/CN/GR/DIL/CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 525 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 525 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7083 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 5893 ft., Bottom: 7083 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3442 ft. | | N | N | | NIOBRARA | 6220 ft. | | N | N | | FORT HAYS | 6414 ft. | | | | | CODELL | 6472 ft. | | N | N | | BENTONITE | 6796 ft. | | | | | D SAND | 6900 ft. | | N | N | | MOWRY | 6969 ft. | | | | | J SAND | 6984 ft. | | N | N |
Formation DSND Formation Classification: GW Status: AB - 7/25/2024 Interval Top: 6914 ft. Interval Bottom: 6924 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 12/10/2000 | Choke Size: | | | Formation Name: | D SAND | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/29/2000 | | Treatment Summary: | 800 BBLS 30# /K X-LINKED GEL WITH 50,000# PROPPANT |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6954 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/10/2000 | Test Method: | ROD PUMP | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 1 | | GRAVITY_OIL | 39 | | MCF_GAS | 150 |
| | Perforation Data: | | Interval Top: | 6914 ft. | # Of Holes: | 40 | | Interval Bottom: | 6924 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/25/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2027 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|