|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/7/2019 Measured TD: 8112 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/7/2019 | | Wellbore Permit | DRIFTED | | Permit #: | 20031223 | Expiration Date: | 7/6/2004 | | Proposed Depth/Form: | 8112 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: W/2 |
| | |
| Wellbore Completed | | Completion Date: | 3/27/2001 | | Spud Date: | 3/6/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 8112 ft. | Measured PB depth: | 8059 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 813 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 813 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8091 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 6700 ft., Bottom: 8091 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5258 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 3970 ft., Bottom: 5265 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4349 ft. | | N | N | | SHANNON | 4825 ft. | | N | N | | NIOBRARA | 7232 ft. | | N | N | | FORT HAYS | 7497 ft. | | N | N | | CODELL | 7517 ft. | | N | N | | J SAND | 7947 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 6/7/2019 Interval Top: 7950 ft. Interval Bottom: 7978 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/27/2001 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 122000 | | CALC_MCF_GAS | 366 | | CASING_PRESS | 500 | | GRAVITY_OIL | 60 | | MCF_GAS | 366 | | TUBING_PRESS | 340 |
| | Perforation Data: | | Interval Top: | 7950 ft. | # Of Holes: | 60 | | Interval Bottom: | 7978 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/7/2019 Interval Top: 7236 ft. Interval Bottom: 7530 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.281 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | PLUNGER | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/27/2001 | | Treatment Summary: | FRAC'D NB-CD W/110100# 20/40 MESH; 107345 GAL. SAND LADEN FLUID NBRR PERFS 7236' - 7314' CODL PERFS 7517' - 7530' |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7508 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/5/2003 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 54 | | CALC_BBLS_OIL | 54 | | CALC_GOR | 2852 | | CALC_MCF_GAS | 154 | | CASING_PRESS | 645 | | GRAVITY_OIL | 60 | | MCF_GAS | 154 | | TUBING_PRESS | 342 |
| | Perforation Data: | | Interval Top: | 7236 ft. | # Of Holes: | | | Interval Bottom: | 7530 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/7/2019| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.000 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/27/2001 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7938 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/2/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 11 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 8370 | | CALC_MCF_GAS | 92 | | CASING_PRESS | 360 | | GRAVITY_OIL | 45 | | MCF_GAS | 92 | | TUBING_PRESS | 311 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/07/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|