|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 3/1/2025 Measured TD: 8114 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 3/1/2025 | | Wellbore Permit | | | Permit #: | 20040027 | Expiration Date: | 1/20/2005 | | Proposed Depth/Form: | 8114 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: N/2SE | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 316, Drill Unit: E2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 575 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 575 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8112 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 210, Top: 6800 ft., Bottom: 8112 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4400 ft., Bottom: 5200 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/6/2000 | | Spud Date: | 10/5/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 8114 ft. | Measured PB depth: | 8067 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY COMPENSATED NEUTRON GR; DUAL INDUCTION GUARD LOG GR;CBL GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 575 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 575 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8112 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 210, Top: 6800 ft., Bottom: 8112 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5240 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 4170 ft., Bottom: 5240 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4418 ft. | | N | N | | SHANNON | 4975 ft. | | N | N | | NIOBRARA | 7270 ft. | | N | N | | CODELL | 7538 ft. | | N | N | | CARLILE | 7560 ft. | | N | N | | GREENHORN | 7582 ft. | | N | N | | BENTONITE | 7801 ft. | | N | N | | GRANEROS | 7802 ft. | | N | N | | MOWRY | 7955 ft. | | N | N | | J-2 SAND | 7970 ft. | | N | N | | SKULL CREEK | 8082 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 3/1/2025 Interval Top: 7972 ft. Interval Bottom: 8030 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/7/2000 | Choke Size: | 0.281 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/6/2000 | | Treatment Summary: | FRAC WELL WITH 231722 GALS FRAC GEL 27,25. WITH 549440# FRAC SAND. 1 PPG THRU 5 PPG. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7970 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/6/2000 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 10 | | CALC_BBLS_H2O | 27 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 99600 | | CALC_MCF_GAS | 996 | | CASING_PRESS | 745 | | MCF_GAS | 996 | | TUBING_PRESS | 570 |
| | Perforation Data: | | Interval Top: | 7972 ft. | # Of Holes: | 100 | | Interval Bottom: | 8030 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: SI - 3/1/2025 Interval Top: 7540 ft. Interval Bottom: 7558 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/6/2000 | | Treatment Summary: | SET CIBP @ 7830'. PERF'D THE CODELL 7540' - 7558' W/4 SPF. FRAC'D THE CODELL W/300,520# SAND AND 93,993 GAL SLF, 120,007 GAL SILVERSTIM FLUID. FLOW BACK WELL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/3/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 69 | | CALC_BBLS_H2O | 33 | | CALC_BBLS_OIL | 69 | | CALC_GOR | 2261 | | CALC_MCF_GAS | 156 | | CASING_PRESS | 380 | | MCF_GAS | 156 |
| | Perforation Data: | | Interval Top: | 7540 ft. | # Of Holes: | 72 | | Interval Bottom: | 7558 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 3/3/2004 Interval Top: 7540 ft. Interval Bottom: 8030 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/6/2000 | | Treatment Summary: | DRILL CBP. CIRCULATE CLEAN. POOH W/TBG. TIH W/TBG. LAND EOT @ 7930'. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/3/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 69 | | CALC_BBLS_H2O | 33 | | CALC_BBLS_OIL | 69 | | CALC_GOR | 2261 | | CALC_MCF_GAS | 156 | | CASING_PRESS | 380 | | MCF_GAS | 156 |
| | Perforation Data: | | Interval Top: | 7540 ft. | # Of Holes: | 172 | | Interval Bottom: | 8030 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 02/28/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 9 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.006 |
| Average MCFE per Day | 0.027 |
| Federal Financial Assurance | i | |
|
|