|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/16/2025 Measured TD: 8121 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/16/2025 | | Wellbore Permit | | | Permit #: | 20032066 | Expiration Date: | 11/17/2004 | | Proposed Depth/Form: | 8121 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-87, Unit Acreage: 160, Drill Unit: SE4 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 160, Drill Unit: SE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 831 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 585, Top: 0 ft., Bottom: 831 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8109 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 355, Top: 6207 ft., Bottom: 8109 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 4300 ft., Bottom: 5000 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/26/2000 | | Spud Date: | 11/27/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 8121 ft. | Measured PB depth: | 8086 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY, COMPENSATED NEUTRON GR DUAL INDUCTION GUARD LOG GR; CBL GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 831 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 585, Top: 0 ft., Bottom: 831 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8109 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 335, Top: 6238 ft., Bottom: 8109 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5046 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 4150 ft., Bottom: 5048 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5046 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 4150 ft., Bottom: 5048 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4481 ft. | | N | N | | SHANNON | 5162 ft. | | N | N | | NIOBRARA | 7216 ft. | | N | N | | FORT HAYS | 7473 ft. | | N | N | | CODELL | 7497 ft. | | N | N | | GREENHORN | 7561 ft. | | N | N | | CARLILE | 7566 ft. | | N | N | | BENTONITE | 7782 ft. | | N | N | | GRANEROS | 7782 ft. | | N | N | | MOWRY | 7935 ft. | | N | N | | J-2 SAND | 7949 ft. | | N | N | | SKULL CREEK | 8069 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 11/21/2001 Interval Top: 7953 ft. Interval Bottom: 8014 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/21/2001 | Choke Size: | 0.313 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/26/2000 | | Treatment Summary: | FRAC W/3000,000# 20/40 FRAC SAND IN 137,970 GALS PHOENIX 20#. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/21/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 22 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 2727 | | CALC_MCF_GAS | 60 | | CASING_PRESS | 220 | | MCF_GAS | 60 |
| | Perforation Data: | | Interval Top: | 7953 ft. | # Of Holes: | 102 | | Interval Bottom: | 8014 ft. | Hole Size: | 0.38 in. |
|
Formation JSND Formation Classification: GW Status: AB - 10/16/2025 Interval Top: 7953 ft. Interval Bottom: 8014 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/26/2000 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 33 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 127083 | | CALC_MCF_GAS | 305 | | CASING_PRESS | 520 | | MCF_GAS | 305 | | TUBING_PRESS | 340 |
| | Perforation Data: | | Interval Top: | 7953 ft. | # Of Holes: | 102 | | Interval Bottom: | 8014 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 1/16/2012 Interval Top: 7498 ft. Interval Bottom: 8014 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/26/2000 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 24 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 13996 | | CALC_MCF_GAS | 329 | | CASING_PRESS | 650 | | MCF_GAS | 329 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 7498 ft. | # Of Holes: | 124 | | Interval Bottom: | 8014 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/17/2009 Interval Top: 7222 ft. Interval Bottom: 8014 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/26/2000 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE - DRILLED UP CBP'S TO COMMINGLE THE JSND-NBRR-CDL. 10/13//09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7928 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/17/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 50 | | BTU_GAS | 1312 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 6480 | | CALC_MCF_GAS | 324 | | CASING_PRESS | 561 | | GRAVITY_OIL | 51 | | MCF_GAS | 324 | | TUBING_PRESS | 283 |
| | Perforation Data: | | Interval Top: | 7222 ft. | # Of Holes: | 300 | | Interval Bottom: | 8014 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/16/2025 Interval Top: 7222 ft. Interval Bottom: 7514 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/26/2000 | | Treatment Summary: | NBRR-CDL RECOMPLETION - SET CBP@7600. 9-11-09. RE-FRAC'D THE CDL DOWN TBG WITH 250,000# 20/40 SAND IN 116,760 GAL OF VISTAR 24 GEL SLF 81,774 GAL VISTAR 24 XLF. 9/14/09. SET CBP@7360. 9/16/09. RE-FRACD THE NBRR WITH 250,980 20/40 SAND AND 3590 BBLS VISTAR |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7222 ft. | # Of Holes: | 198 | | Interval Bottom: | 7514 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/8/2003 Interval Top: 7222 ft. Interval Bottom: 7415 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/26/2000 | | Treatment Summary: | SET CIBP @ 7465'. PERF'D THE NIOBRARA FROM 7222 - 7415'. FRAC'D W/238,000 GALS SLICKWATER WITH 100,000# 20/40 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7204 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/8/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 16 | | BBLS_OIL | 19 | | CALC_BBLS_H2O | 16 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 4789 | | CALC_MCF_GAS | 91 | | CASING_PRESS | 70 | | MCF_GAS | 91 |
| | Perforation Data: | | Interval Top: | 7222 ft. | # Of Holes: | | | Interval Bottom: | 7415 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/16/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2027 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|