Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20052
Well Classification: GW Status: PA - 10/16/2025
Well Name/No:IONE #33-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/16/2025
FacilityID:257964LocationID:331030
County:WELD #123Location:NWSE 2 2N66W 6
Field:WATTENBERG - #90750Elevation:5061 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2006FSL  1962 FELLat/Long: 40.165327 / -104.742299Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.165388 / -104.741975Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 10/16/2025             Measured TD: 8121 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 10/16/2025
Wellbore Permit
Permit #:20032066 Expiration Date:11/17/2004
Proposed Depth/Form:8121 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-87, Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 831 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 585, Top: 0 ft., Bottom: 831 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8109 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 355, Top: 6207 ft., Bottom: 8109 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 150, Top: 4300 ft., Bottom: 5000 ft.

Wellbore Completed
Completion Date:12/26/2000
Spud Date:11/27/2000Spud Date Is:ACTUAL
Measured TD:8121 ft.Measured PB depth:8086 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY, COMPENSATED NEUTRON GR DUAL INDUCTION GUARD LOG GR; CBL GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 831 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 585, Top: 0 ft., Bottom: 831 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8109 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 6238 ft., Bottom: 8109 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5046 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 4150 ft., Bottom: 5048 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5046 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 4150 ft., Bottom: 5048 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4481 ft.NN
SHANNON5162 ft.NN
NIOBRARA7216 ft.NN
FORT HAYS7473 ft.NN
CODELL7497 ft.NN
GREENHORN7561 ft.NN
CARLILE7566 ft.NN
BENTONITE7782 ft.NN
GRANEROS7782 ft.NN
MOWRY7935 ft.NN
J-2 SAND7949 ft.NN
SKULL CREEK8069 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/21/2001                Interval Top: 7953 ft.    Interval Bottom: 8014 ft.

 Completed Information for Formation CODELL
1st Production Date:11/21/2001Choke Size:0.313 in.
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/26/2000
Treatment Summary:FRAC W/3000,000# 20/40 FRAC SAND IN 137,970 GALS PHOENIX 20#.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/21/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 24
BBLS_OIL 22
CALC_BBLS_H2O 24
CALC_BBLS_OIL 22
CALC_GOR 2727
CALC_MCF_GAS 60
CASING_PRESS 220
MCF_GAS 60
Perforation Data:
Interval Top:7953 ft.# Of Holes:102
Interval Bottom:8014 ft.Hole Size:0.38 in.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 10/16/2025                Interval Top: 7953 ft.    Interval Bottom: 8014 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/26/2000
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 33
BBLS_OIL 2
CALC_BBLS_H2O 33
CALC_BBLS_OIL 2
CALC_GOR 127083
CALC_MCF_GAS 305
CASING_PRESS 520
MCF_GAS 305
TUBING_PRESS 340
Perforation Data:
Interval Top:7953 ft.# Of Holes:102
Interval Bottom:8014 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 1/16/2012                 Interval Top: 7498 ft.    Interval Bottom: 8014 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/26/2000
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 24
CALC_BBLS_H2O 8
CALC_BBLS_OIL 24
CALC_GOR 13996
CALC_MCF_GAS 329
CASING_PRESS 650
MCF_GAS 329
TUBING_PRESS 400
Perforation Data:
Interval Top:7498 ft.# Of Holes:124
Interval Bottom:8014 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/17/2009                Interval Top: 7222 ft.    Interval Bottom: 8014 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/26/2000
Treatment Summary:JSND-NBRR-CDL COMMINGLE - DRILLED UP CBP'S TO COMMINGLE THE JSND-NBRR-CDL. 10/13//09.
Tubing Size:2.375 in.Tubing Setting Depth:7928 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 50
BTU_GAS 1312
CALC_BBLS_H2O 21
CALC_BBLS_OIL 50
CALC_GOR 6480
CALC_MCF_GAS 324
CASING_PRESS 561
GRAVITY_OIL 51
MCF_GAS 324
TUBING_PRESS 283
Perforation Data:
Interval Top:7222 ft.# Of Holes:300
Interval Bottom:8014 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/16/2025                Interval Top: 7222 ft.    Interval Bottom: 7514 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/26/2000
Treatment Summary:NBRR-CDL RECOMPLETION - SET CBP@7600. 9-11-09. RE-FRAC'D THE CDL DOWN TBG WITH 250,000# 20/40 SAND IN 116,760 GAL OF VISTAR 24 GEL SLF 81,774 GAL VISTAR 24 XLF. 9/14/09. SET CBP@7360. 9/16/09. RE-FRACD THE NBRR WITH 250,980 20/40 SAND AND 3590 BBLS VISTAR
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7222 ft.# Of Holes:198
Interval Bottom:7514 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/8/2003                  Interval Top: 7222 ft.    Interval Bottom: 7415 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/26/2000
Treatment Summary:SET CIBP @ 7465'. PERF'D THE NIOBRARA FROM 7222 - 7415'. FRAC'D W/238,000 GALS SLICKWATER WITH 100,000# 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7204 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/8/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 19
CALC_BBLS_H2O 16
CALC_BBLS_OIL 19
CALC_GOR 4789
CALC_MCF_GAS 91
CASING_PRESS 70
MCF_GAS 91
Perforation Data:
Interval Top:7222 ft.# Of Holes:
Interval Bottom:7415 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/16/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No