Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20040
Well Classification: OW Status: PA - 7/27/2022
Well Name/No:CAPEHART #42-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/27/2022
FacilityID:257910LocationID:331021
County:WELD #123Location:SENE 29 6N64W 6
Field:WATTENBERG - #90750Elevation:4682 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2017FNL  860 FELLat/Long: 40.458565 / -104.567856Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.458470 / -104.567750Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/27/2022             Measured TD: 7126 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/27/2022
Wellbore Permit
Permit #:000888 Expiration Date:8/24/2001
Proposed Depth/Form:7300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2NE4

Wellbore Completed
Completion Date:N/A
Spud Date:9/29/2000Spud Date Is:ACTUAL
Measured TD:7126 ft.Measured PB depth:7097 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR, IND,DENSITY,NEUTRON
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 390 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 390 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7097 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 5872 ft., Bottom: 7097 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7097 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 3225 ft., Bottom: 5872 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 3125 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 3146 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2795 ft.NN
PARKMAN3575 ft.NN
SUSSEX4362 ft.NN
NIOBRARA6590 ft.NN
FORT HAYS6850 ft.NN
CODELL6894 ft.NN
CARLILE6914 ft.NN
GREENHORN6944 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/2/2012                  Interval Top: 6899 ft.    Interval Bottom: 6907 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/13/2011
Treatment Summary:Re-pref Codell 6899'-6907' (24 holes) Re-Frac'd Codell w/ 119 bbl FE-1A pad, 598 bbls of 26# pHaser pad, 2012 bbls of 26# pHaser, 217120# 20/40 Preferd Rock , 8000 lbs# 20/40 SB Excel.
Formation Treatment
Treatment Date:10/12/2000
Treatment Summary:10/12/00 BJ FRACED WITH 3355 BBL OF 22# VISTAR GEL AND 4,000# OF 12/20RC & 237,600# OF 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 37
CALC_BBLS_H2O 3
CALC_BBLS_OIL 37
CALC_MCF_GAS 220
CASING_PRESS 200
MCF_GAS 220
Perforation Data:
Interval Top:6899 ft.# Of Holes:24
Interval Bottom:6907 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/8/2022                  Interval Top: 6600 ft.    Interval Bottom: 6907 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/9/2000Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 26
BTU_GAS 1418
CALC_BBLS_H2O 1
CALC_BBLS_OIL 26
CALC_GOR 1008
CALC_MCF_GAS 262
CASING_PRESS 400
GRAVITY_OIL 57
MCF_GAS 262
TUBING_PRESS 400
Perforation Data:
Interval Top:6600 ft.# Of Holes:52
Interval Bottom:6907 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/1/2012                  Interval Top: 6600 ft.    Interval Bottom: 6735 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/13/2011
Treatment Summary:Perf'd Niobrara "A" 6600-6602 ' (4 holes),Niobrara "B" 6727'-6735' (24 holes) ReFrac'd Niobrara with 119 bbl active pad, 1549 bbls of Slickwater pad, 142 bbls of pHaser 20# pad, 2279 bbls of pHaser 20# fluid system and 239020# of 20/42 Preferred Rock, 12000 # 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6600 ft.# Of Holes:28
Interval Bottom:6735 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/27/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No