|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/24/2024 Measured TD: 8085 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/24/2024 | | Wellbore Permit | | | Permit #: | 20021021 | Expiration Date: | 5/28/2003 | | Proposed Depth/Form: | 8085 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 737 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 510, Top: 0 ft., Bottom: 737 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8085 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 3810 ft., Bottom: 5030 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/31/2000 | | Spud Date: | 5/25/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 8085 ft. | Measured PB depth: | 8066 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | PEAILC, PECNLD, PEML GR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 727 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 510, Top: 0 ft., Bottom: 727 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8085 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 6522 ft., Bottom: 8085 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5060 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 3808 ft., Bottom: 5078 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4480 ft. | | N | N | | NIOBRARA | 7214 ft. | | N | N | | FORT HAYS | 7485 ft. | | N | N | | CODELL | 7507 ft. | | N | N | | J SAND | 7944 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/24/2024 Interval Top: 7970 ft. Interval Bottom: 7990 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/15/2000 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/8/2013 | Treatment End Date: | N/A | | Treatment Summary: | CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB/CD PRODUCTION. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 10/31/2000 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 2 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 151500 | | CALC_MCF_GAS | 303 | | CASING_PRESS | 490 | | GRAVITY_OIL | 60 | | MCF_GAS | 303 | | TUBING_PRESS | 375 |
| | Perforation Data: | | Interval Top: | 7970 ft. | # Of Holes: | 60 | | Interval Bottom: | 7990 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/22/2013 Interval Top: 7278 ft. Interval Bottom: 7990 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 10/23/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/14/2012 | Treatment End Date: | N/A | | Treatment Summary: | CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB/CD PRODUCTION. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 10/31/2000 | | Treatment Summary: | COMMINGLED JNBCD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7941 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/14/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | BTU_GAS | 1305 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 3333 | | CALC_MCF_GAS | 10 | | CASING_PRESS | 521 | | GRAVITY_OIL | 46 | | MCF_GAS | 10 | | TUBING_PRESS | 412 |
| | Perforation Data: | | Interval Top: | 7278 ft. | # Of Holes: | 201 | | Interval Bottom: | 7990 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/24/2024 Interval Top: 7278 ft. Interval Bottom: 7522 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.375 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | PLUNGER | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/31/2000 | | Treatment Summary: | SEE SCANNED DOC# 1197816 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7492 ft. | | Tubing Packer Depth: | 7690 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/12/2003 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 22 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 2636 | | CALC_MCF_GAS | 58 | | CASING_PRESS | 560 | | GRAVITY_OIL | 60 | | MCF_GAS | 58 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 7278 ft. | # Of Holes: | | | Interval Bottom: | 7522 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/24/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|