|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2020 Measured TD: 8305 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2020 | | Wellbore Permit | | | Permit #: | 20020814 | Expiration Date: | 5/12/2003 | | Proposed Depth/Form: | 8305 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 701 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 701 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8301 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 3950 ft., Bottom: 8301 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/17/2000 | | Spud Date: | 4/9/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 8305 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 701 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 701 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8301 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6730 ft., Bottom: 8301 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5084 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 3950 ft., Bottom: 5090 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5084 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 3950 ft., Bottom: 5090 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4552 ft. | | N | N | | NIOBRARA | 7286 ft. | | N | N | | FORT HAYS | 7555 ft. | | N | N | | CODELL | 7578 ft. | | N | N | | J SAND | 8013 ft. | | N | N | | DAKOTA | 8200 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 5/17/2000 Interval Top: 8206 ft. Interval Bottom: 8216 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | JSND COMPLETION. | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/17/2000 | | Treatment Summary: | PLACED CIBP OVER DKTA @8164. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | Perforation Data: | | Interval Top: | 8206 ft. | # Of Holes: | | | Interval Bottom: | 8216 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: SI - 7/1/2020 Interval Top: 8013 ft. Interval Bottom: 8044 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/23/2000 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/9/2002 | | Treatment Summary: | DRILLED OUT CIBP TO COMMINGLED J/NB-CD. FIRST DATE OF PRODUCTION 9/11/2002. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7999 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/5/2007 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 3 | | BTU_GAS | 1185 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 118667 | | CALC_MCF_GAS | 53 | | CASING_PRESS | 230 | | GRAVITY_OIL | 60 | | MCF_GAS | 356 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 8013 ft. | # Of Holes: | 58 | | Interval Bottom: | 8044 ft. | Hole Size: | 0.32 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 9/1/2018 Interval Top: 7360 ft. Interval Bottom: 7590 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/18/2002 | Choke Size: | 18.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/18/2002 | | Treatment Summary: | NBRR PERF 7630 - 7372, HOLES 12, SIZE 0.35/ CODL PERF 7580-7590, HOLES 10, SIZE 0.35. NO ADDITIONAL TREATMENT. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7999 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/5/2007 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 18 | | BTU_GAS | 1185 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 3667 | | CALC_MCF_GAS | 22 | | CASING_PRESS | 230 | | GRAVITY_OIL | 60 | | MCF_GAS | 113 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7360 ft. | # Of Holes: | 22 | | Interval Bottom: | 7590 ft. | Hole Size: | 0.35 in. |
|
Formation DK-J Formation Classification: GW Status: CM - 3/5/2007| Completed Information for Formation DAKOTA-JSND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA-JSND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/17/2000 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DK-J. |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/14/2002| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.375 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/17/2000 | | Treatment Summary: | COMMINGLED JNBCD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7999 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/14/2002 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 11 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 10273 | | CALC_MCF_GAS | 113 | | CASING_PRESS | 350 | | GRAVITY_OIL | 60 | | MCF_GAS | 113 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 06/30/2020 |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|