|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2025 Measured TD: 8014 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2025 | | Wellbore Permit | | | Permit #: | 20000273 | Expiration Date: | 1/23/2002 | | Proposed Depth/Form: | 8014 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4800 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 4000 ft., Bottom: 4800 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/30/2000 | | Spud Date: | 5/4/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 8014 ft. | Measured PB depth: | 7967 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY, COMPENSATED NEUTRON GR DUAL INDUCTION GUARD LOG GR; CBL GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 689 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 485, Top: 0 ft., Bottom: 689 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8014 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 6530 ft., Bottom: 8014 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4964 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 4050 ft., Bottom: 4964 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4407 ft. | | N | N | | NIOBRARA | 7123 ft. | | N | N | | FORT HAYS | 7383 ft. | | N | N | | CODELL | 7407 ft. | | N | N | | CARLILE | 7426 ft. | | N | N | | GREENHORN | 7464 ft. | | N | N | | BENTONITE | 7680 ft. | | N | N | | GRANEROS | 7681 ft. | | N | N | | MOWRY | 7830 ft. | | N | N | | J-2 SAND | 7845 ft. | | N | N | | SKULL CREEK | 7969 ft. | | N | N |
Formation JSND Formation Classification: GW Status: TA - 6/13/2019 Interval Top: 7848 ft. Interval Bottom: 7914 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/31/2000 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/30/2000 | | Treatment Summary: | FRAC WELL W/ 550,000# 20/40 FRAC SAND, 1PPG THRU 5PPG, IN 231,900 GALS FRAC GEL 27#HT & 25# |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 6 | | CALC_GOR | 120612 | | CASING_PRESS | 720 | | MCF_GAS | 844 | | TUBING_PRESS | 600 |
| | Perforation Data: | | Interval Top: | 7848 ft. | # Of Holes: | 112 | | Interval Bottom: | 7914 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: GW Status: CM - 2/13/2002 Interval Top: 7407 ft. Interval Bottom: 7424 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/14/2001 | Choke Size: | 0.375 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/30/2000 | | Treatment Summary: | FRAC W/300,960 # 20/40 FRAC SAND IN 130,000 GALS PHOENIX 22# & 20 #. FLOW BACK FRAC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/13/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 33 | | CALC_GOR | 3017 | | CASING_PRESS | 720 | | MCF_GAS | 99 |
| | Perforation Data: | | Interval Top: | 7407 ft. | # Of Holes: | 34 | | Interval Bottom: | 7424 ft. | Hole Size: | 0.3 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 4/28/2002 Interval Top: 7407 ft. Interval Bottom: 7914 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 3/29/2002 | Choke Size: | 0.250 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/30/2000 | | Treatment Summary: | DRILL OUT CIBP. RIH W/PROD TBG. SWAB WELL BACK. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7834 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/28/2002 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 30 | | CALC_GOR | 31385 | | CASING_PRESS | 525 | | MCF_GAS | 938 | | TUBING_PRESS | 325 |
| | Perforation Data: | | Interval Top: | 7407 ft. | # Of Holes: | 146 | | Interval Bottom: | 7914 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/3/2009 Interval Top: 7264 ft. Interval Bottom: 7914 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/30/2000 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. RELEASED RFP @ 7280'. 3/24/09. RELEASED RBP @ 7450' TO COMMINGLE THE JSND-NBRR-CODL. 3/29/09 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7834 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/3/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 10 | | BTU_GAS | 1229 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 20000 | | CALC_MCF_GAS | 200 | | CASING_PRESS | 569 | | GRAVITY_OIL | 52 | | MCF_GAS | 200 | | TUBING_PRESS | 267 |
| | Perforation Data: | | Interval Top: | 7264 ft. | # Of Holes: | 236 | | Interval Bottom: | 7914 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 7176 ft. Interval Bottom: 7424 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/29/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/22/2009 | | Treatment Summary: | NBRR-CDL REFRAC AND RECOMPLETION. SET RBP @ 7450'. 2/19/09. RE-FRAC'D THE CODL WITH 110922 GAL 24 VISTAR HYBRID CROSS LINKED GEL CONTAINING 251320# 20/40 SAND. 2/22/09. SET RFP @ 7280'. 2/22/09. FRAC'D NBRR WITH 141666 GAL 20# TO 18# VISTAR |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7176 ft. | # Of Holes: | 108 | | Interval Bottom: | 7424 ft. | Hole Size: | 0.4166667 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 4 |
| Total Gas Produced (MCF) | 57 |
| GOR | 14250 |
| GOR Determination | BOE |
| Average BOE per Day | 0.039 |
| Average MCFE per Day | 0.225 |
| Federal Financial Assurance | i | |
|
|