|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2020 Measured TD: 8020 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 1/30/2002 | | Proposed Depth/Form: | 8020 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: NE4 |
| | |
| Wellbore Completed | | Completion Date: | 4/26/2000 | | Spud Date: | 3/30/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 8020 ft. | Measured PB depth: | 7984 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIGL/GR: CBL VDL GR;CDCN GR. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 715 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 715 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8021 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 6614 ft., Bottom: 8021 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4397 ft. | | N | N | | SHANNON | 5040 ft. | | N | N | | NIOBRARA | 7114 ft. | | N | N | | FORT HAYS | 7367 ft. | | N | N | | CODELL | 7390 ft. | | N | N | | CARLILE | 7409 ft. | | N | N | | GREENHORN | 7451 ft. | | N | N | | BENTONITE | 7669 ft. | | N | N | | GRANEROS | 7670 ft. | | N | N | | MOWRY | 7822 ft. | | N | N | | J-2 SAND | 7836 ft. | | N | N | | SKULL CREEK | 7958 ft. | | N | N |
Formation JSND Formation Classification: OG Status: PR - 6/1/2020 Interval Top: 7838 ft. Interval Bottom: 7910 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/26/2000 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 67913 | | CALC_MCF_GAS | 312 | | CASING_PRESS | 550 | | MCF_GAS | 312 | | TUBING_PRESS | 380 |
| | Perforation Data: | | Interval Top: | 7838 ft. | # Of Holes: | 108 | | Interval Bottom: | 7910 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 4/4/2004 Interval Top: 7390 ft. Interval Bottom: 7408 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/6/2001 | Choke Size: | 0.188 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/26/2000 | | Treatment Summary: | FRAC WELL W/13300# 100 MESH (1.5PPG, 1 PPG) AND 100000# 20/40 FRAC SAND (1PPG THRU 3 PPG) IN 77000 GALS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/6/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 27 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 4630 | | CALC_MCF_GAS | 125 | | CASING_PRESS | 220 | | MCF_GAS | 125 |
| | Perforation Data: | | Interval Top: | 7390 ft. | # Of Holes: | 36 | | Interval Bottom: | 7408 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: OW Status: CM - 9/12/2011 Interval Top: 7390 ft. Interval Bottom: 7910 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/26/2000 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7832 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/12/2001 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 28 | | CALC_BBLS_H2O | 7 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 6578 | | CALC_MCF_GAS | 186 | | CASING_PRESS | 630 | | MCF_GAS | 186 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 7390 ft. | # Of Holes: | 144 | | Interval Bottom: | 7910 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 9/12/2011 Interval Top: 7130 ft. Interval Bottom: 7910 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/7/2011 | | Treatment Summary: | CIBP SET @ 7450 AND CFP SET @ 7340 ON 5/4/11. DRILLED OUT 6/1/11. TUBING SET @ 7804 ON 6/2/11.
COMMINGLED ON 6/4/2011. | | Formation Treatment | | Treatment Date: | 4/26/2000 | | Treatment Summary: | JSND-NIOBRARA-CODELL COMMINGLE DRILL CBP @ 7370' TO COMMINGLE THE JSND-NIOBRARA - CODELL, 4-22-04 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7804 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/7/2011 | Test Method: | FLOWING | | Hours Tested: | 5 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 22 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 106 | | CALC_GOR | 7455 | | CALC_MCF_GAS | 787 | | CASING_PRESS | 638 | | GRAVITY_OIL | 51 | | MCF_GAS | 164 | | TUBING_PRESS | 514 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 264 | | Interval Bottom: | 7910 ft. | Hole Size: | 0.48 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 6/1/2020 Interval Top: 7130 ft. Interval Bottom: 7409 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/4/2011 | | Treatment Summary: | NBRR-FRAC'D 7130'-7160', 7280'-7310' W/250,920# SAND AND 146,580 GAL FRAC FLUID
CD-FRAC'D 7390-7409 W/ 251,000# SAND AND 124,530 GAL FRAC FLUID
CIBP SET @ 7450 AND CFP SET @ 7340 ON 5/4/11. DRILLED OUT 6/1/11.
| | Formation Treatment | | Treatment Date: | 4/26/2000 | | Treatment Summary: | NB-CD RECOMPLETION SET CBP @ 7370'. 03-22-04 FRAC'D THE NIOBRARA 7130'-7310' W/200,160# 20/40 SAND AND 147,000 GAL FLUID. 04/01/04 FRAC'D THE CODELL 7390'-7408' W/13,300# 100 MESH (1/2 PPG,1 PPG) AND 100,000# 20/40 FRAC SAND (1 PPG THRU 3 PPG)IN 77,000 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 36 | | BBLS_OIL | 51 | | CALC_BBLS_H2O | 36 | | CALC_BBLS_OIL | 51 | | CALC_GOR | 3863 | | CALC_MCF_GAS | 197 | | CASING_PRESS | 400 | | MCF_GAS | 197 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 156 | | Interval Bottom: | 7409 ft. | Hole Size: | 0.48 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 775 |
| Total Gas Produced (MCF) | 4905 |
| GOR | 6329 |
| GOR Determination | BOE |
| Average BOE per Day | 4.452 |
| Average MCFE per Day | 25.802 |
| Federal Financial Assurance | i | |
|
|