Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19931
Well Classification: GW Status: TA - 5/12/2021
Well Name/No:MARCY #31-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date5/12/2021
FacilityID:256825LocationID:330956
County:WELD #123Location:SWNE 31 6N64W 6
Field:WATTENBERG - #90750Elevation:4634 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1985FNL  1977 FELLat/Long: 40.444115 / -104.590706Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.444250 / -104.590690Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 5/12/2021             Measured TD: 7100 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 5/12/2021
Wellbore Permit
Permit #:000180 Expiration Date:2/28/2001
Proposed Depth/Form:7700 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2

Wellbore Completed
Completion Date:3/17/2000
Spud Date:3/3/2000Spud Date Is:ACTUAL
Measured TD:7100 ft.Measured PB depth:7054 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR, IND, DENSITY, NEUTRON, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 438 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 438 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7054 ft., Weight: 10.50 , Citings Type: ACTUAL
Cement:Sacks: 349, Top: 3300 ft., Bottom: 7054 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3300 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 301, Top: 0 ft., Bottom: 3300 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3485 ft.NN
SUSSEX4227 ft.NN
SHANNON4582 ft.NN
NIOBRARA6539 ft.NN
CODELL6848 ft.NN
CARLILE6865 ft.NN
GREENHORN6897 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/9/2011                  Interval Top: 6850 ft.    Interval Bottom: 6858 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/13/2010
Treatment Summary:Re-Perf Codell 6850'-6858'' (24 new holes) Original perf 6850'-6858' (32 holes) Re-Frac'd Codell w/ 596 bbls of 26# pHaser pad, 1944 bbls of 26# pHaser, 217810# 30/50 , 8000 ibs 20/40 SB Excel
Formation Treatment
Treatment Date:3/17/2000
Treatment Summary:3/17/00 BJ SERVICES FRACED W/87780 GAL OF 18# VISTAR GEL, 10300# OF 100MES 225140# OF 20/40 AND 10200# OF 12/20.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 58
CALC_BBLS_H2O 13
CALC_BBLS_OIL 58
CALC_GOR 3344
CALC_MCF_GAS 194
CASING_PRESS 476
MCF_GAS 194
Perforation Data:
Interval Top:6850 ft.# Of Holes:56
Interval Bottom:6858 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  TA - 5/12/2021                 Interval Top: 6560 ft.    Interval Bottom: 6858 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/14/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 14
BTU_GAS 1245
CALC_BBLS_H2O 3
CALC_BBLS_OIL 14
CALC_GOR 7714
CALC_MCF_GAS 108
CASING_PRESS 1300
GRAVITY_OIL 52
MCF_GAS 108
TUBING_PRESS 865
Perforation Data:
Interval Top:6560 ft.# Of Holes:84
Interval Bottom:6858 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/2/2011                  Interval Top: 6560 ft.    Interval Bottom: 6760 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/27/2010
Treatment Summary:Perf Niobrara "A" 6560'-6564'' (8 holes), Niobrara "B" 6682'-6688' (12 holes)and Niobrara "C" 6756'-6760' (8 holes) Frac'd Niobrara W/ 24 bbls 15% HCL, 1548 bbls of slickwater pad, 144 bbls of pHaser 22# pad, 2198 bbls 22# pHaser, 238160# 30/50, 12,000 20/40 SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6560 ft.# Of Holes:28
Interval Bottom:6760 ft.Hole Size:0.35 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
03/31/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/07/2022
Defined Inactive (TA )YDefined Inactive
01/31/2021
Low ProducingYProduction Period
11/2024 - 10/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No