Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19928
Well Classification: GW Status: PR - 12/10/2025
Well Name/No:KAWAKAMI #42-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/10/2025
FacilityID:256811LocationID:330953
County:WELD #123Location:SENE 35 3N67W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2165FNL  460 FELLat/Long: 40.182856 / -104.850312Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.182960 / -104.850371Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/29/2013
End Date: 5/29/2013
Reported: 7/28/2013
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/10/2025             Measured TD: 7930 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/10/2025
Wellbore Permit
Permit #:Expiration Date:2/27/2001
Proposed Depth/Form:7936 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 318A,407-8, Unit Acreage: 80, Drill Unit: E2NE
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 319, Drill Unit: E2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 410 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 345, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7933 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 6760 ft., Bottom: 7933 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5014 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 230, Top: 3908 ft., Bottom: 5020 ft.

Wellbore Completed
Completion Date:4/13/2000
Spud Date:3/5/2000Spud Date Is:ACTUAL
Measured TD:7930 ft.Measured PB depth:7889 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:COMP DENS, DOMP NEUTRON GR, DUAL IND GL/GR; CBL GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 410 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 0 ft., Bottom: 410 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7933 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6760 ft., Bottom: 7933 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5014 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 3900 ft., Bottom: 5020 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5014 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 3900 ft., Bottom: 5020 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4210 ft.NN
SHANNON4793 ft.NN
NIOBRARA7049 ft.NN
FORT HAYS7299 ft.NN
CODELL7322 ft.NN
CARLILE7344 ft.NN
GREENHORN7374 ft.NN
BENTONITE7591 ft.NN
GRANEROS7592 ft.NN
MOWRY7741 ft.NN
J-2 SAND7756 ft.NN
SKULL CREEK7872 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 12/10/2025                Interval Top: 7758 ft.    Interval Bottom: 7824 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/13/2000
Treatment Summary:
Formation Treatment
Treatment Date:4/7/2000
Treatment Summary:J-Sand Perforated Intervals: 7758'-7774'; 7782'-7824'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 27
CALC_BBLS_H2O 11
CALC_BBLS_OIL 27
CALC_GOR 8815
CALC_MCF_GAS 238
CASING_PRESS 670
MCF_GAS 238
TUBING_PRESS 430
Perforation Data:
Interval Top:7758 ft.# Of Holes:116
Interval Bottom:7824 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/10/2025                Interval Top: 7322 ft.    Interval Bottom: 7344 ft.

 Completed Information for Formation CODELL
1st Production Date:1/5/2001Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/29/2013Treatment End Date:5/29/2013
Treatment Summary:Set CIBP @ 7450. Tri-frac Codell w/250,040# sand and 81,037 gal frac fluid 5/29/13.
Total fluid used in treatment (bbls):1929Max pressure during treatment (psi):3146
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.67
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):360
Fresh water used in treatment (bbls):1929Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250040Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/25/2009
Treatment Summary:Codell original perf & frac 2001; refrac 2009.
Formation Treatment
Treatment Date:4/13/2000
Treatment Summary:FRAC WELL WITH 132641 GALS PHOENIX 22# & 20# GEL, WITH 250260# 20/40 FRAC SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 42
CALC_BBLS_H2O 15
CALC_BBLS_OIL 42
CALC_GOR 5881
CALC_MCF_GAS 247
CASING_PRESS 160
MCF_GAS 247
Perforation Data:
Interval Top:7322 ft.# Of Holes:88
Interval Bottom:7344 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 6/27/2013                 Interval Top: 7108 ft.    Interval Bottom: 7824 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:6/15/2013Treatment End Date:N/A
Treatment Summary:Drilled out CIBP at 7450' on 5/31/13. Turned to production 6/6/2013. Commingled the J Sand, Niobrara and Codell.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/25/2009
Treatment Summary:JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7220'. 3/3/09. DRILLED OUT CBP @ 7450' TO COMMINGLE THE JSND-NBRR-CDL. 3-4-09
Tubing Size:2.375 in.Tubing Setting Depth:7723 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/15/2013Test Method:FLOW
Hours Tested:7Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 14
BTU_GAS 1317
CALC_BBLS_H2O 96
CALC_BBLS_OIL 48
CALC_GOR 9063
CALC_MCF_GAS 435
CASING_PRESS 635
GRAVITY_OIL 62
MCF_GAS 127
TUBING_PRESS 286
Perforation Data:
Interval Top:7108 ft.# Of Holes:244
Interval Bottom:7824 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 12/10/2025                Interval Top: 7108 ft.    Interval Bottom: 7344 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/25/2009
Treatment Summary:NB/CD RECOMPLETION; SET CBP@7450 1/18/09 REFRAC'D THE CD W 114,744 GAL # VISTAR 24# HYBRID CROSS LINKED GEL CONTAINING 251,240@ SAND 1/25/09. SET CFP@7220 1/25/09 FRAC'D THE NB W/147420 GAL 22 TO 18# VISTAR CROSS LINKED GEL HYBRID CONTAINING 252,060# SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 36
BBLS_OIL 67
BTU_GAS 1282
CALC_BBLS_H2O 36
CALC_BBLS_OIL 67
CALC_GOR 7955
CALC_MCF_GAS 533
CASING_PRESS 430
GRAVITY_OIL 57
MCF_GAS 533
Perforation Data:
Interval Top:7108 ft.# Of Holes:128
Interval Bottom:7344 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/10/2025                Interval Top: 7108 ft.    Interval Bottom: 7128 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/1/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/29/2013Treatment End Date:5/29/2013
Treatment Summary:Refrac NB w/250,280# sand and 89,779 gal frac fluid 5/29/13.
Total fluid used in treatment (bbls):2138Max pressure during treatment (psi):4838
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):360
Fresh water used in treatment (bbls):2138Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250280Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7108 ft.# Of Holes:40
Interval Bottom:7128 ft.Hole Size:0.71 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No