|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/10/2025 Measured TD: 7930 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/10/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 2/27/2001 | | Proposed Depth/Form: | 7936 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 318A,407-8, Unit Acreage: 80, Drill Unit: E2NE | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 319, Drill Unit: E2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 410 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 345, Top: 0 ft., Bottom: 410 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7933 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: 6760 ft., Bottom: 7933 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5014 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: 3908 ft., Bottom: 5020 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/13/2000 | | Spud Date: | 3/5/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 7930 ft. | Measured PB depth: | 7889 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | COMP DENS, DOMP NEUTRON GR, DUAL IND GL/GR; CBL GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 410 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 345, Top: 0 ft., Bottom: 410 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7933 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 6760 ft., Bottom: 7933 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5014 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 3900 ft., Bottom: 5020 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4210 ft. | | N | N | | SHANNON | 4793 ft. | | N | N | | NIOBRARA | 7049 ft. | | N | N | | FORT HAYS | 7299 ft. | | N | N | | CODELL | 7322 ft. | | N | N | | CARLILE | 7344 ft. | | N | N | | GREENHORN | 7374 ft. | | N | N | | BENTONITE | 7591 ft. | | N | N | | GRANEROS | 7592 ft. | | N | N | | MOWRY | 7741 ft. | | N | N | | J-2 SAND | 7756 ft. | | N | N | | SKULL CREEK | 7872 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 12/10/2025 Interval Top: 7758 ft. Interval Bottom: 7824 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/13/2000 | | Treatment Summary: | | | Formation Treatment | | Treatment Date: | 4/7/2000 | | Treatment Summary: | J-Sand Perforated Intervals: 7758'-7774'; 7782'-7824'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 27 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 8815 | | CALC_MCF_GAS | 238 | | CASING_PRESS | 670 | | MCF_GAS | 238 | | TUBING_PRESS | 430 |
| | Perforation Data: | | Interval Top: | 7758 ft. | # Of Holes: | 116 | | Interval Bottom: | 7824 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/10/2025 Interval Top: 7322 ft. Interval Bottom: 7344 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/5/2001 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/29/2013 | Treatment End Date: | 5/29/2013 | | Treatment Summary: | Set CIBP @ 7450. Tri-frac Codell w/250,040# sand and 81,037 gal frac fluid 5/29/13.
| | Total fluid used in treatment (bbls): | 1929 | Max pressure during treatment (psi): | 3146 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.67 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 360 | | Fresh water used in treatment (bbls): | 1929 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250040 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 1/25/2009 | | Treatment Summary: | Codell original perf & frac 2001; refrac 2009. | | Formation Treatment | | Treatment Date: | 4/13/2000 | | Treatment Summary: | FRAC WELL WITH 132641 GALS PHOENIX 22# & 20# GEL, WITH 250260# 20/40 FRAC SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 42 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 42 | | CALC_GOR | 5881 | | CALC_MCF_GAS | 247 | | CASING_PRESS | 160 | | MCF_GAS | 247 |
| | Perforation Data: | | Interval Top: | 7322 ft. | # Of Holes: | 88 | | Interval Bottom: | 7344 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/27/2013 Interval Top: 7108 ft. Interval Bottom: 7824 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/15/2013 | Treatment End Date: | N/A | | Treatment Summary: | Drilled out CIBP at 7450' on 5/31/13. Turned to production 6/6/2013. Commingled the J Sand, Niobrara and Codell. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 1/25/2009 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7220'. 3/3/09. DRILLED OUT CBP @ 7450' TO COMMINGLE THE JSND-NBRR-CDL. 3-4-09 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7723 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/15/2013 | Test Method: | FLOW | | Hours Tested: | 7 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 14 | | BTU_GAS | 1317 | | CALC_BBLS_H2O | 96 | | CALC_BBLS_OIL | 48 | | CALC_GOR | 9063 | | CALC_MCF_GAS | 435 | | CASING_PRESS | 635 | | GRAVITY_OIL | 62 | | MCF_GAS | 127 | | TUBING_PRESS | 286 |
| | Perforation Data: | | Interval Top: | 7108 ft. | # Of Holes: | 244 | | Interval Bottom: | 7824 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 12/10/2025 Interval Top: 7108 ft. Interval Bottom: 7344 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/25/2009 | | Treatment Summary: | NB/CD RECOMPLETION; SET CBP@7450 1/18/09 REFRAC'D THE CD W 114,744 GAL # VISTAR 24# HYBRID CROSS LINKED GEL CONTAINING 251,240@ SAND 1/25/09. SET CFP@7220 1/25/09 FRAC'D THE NB W/147420 GAL 22 TO 18# VISTAR CROSS LINKED GEL HYBRID CONTAINING 252,060# SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 36 | | BBLS_OIL | 67 | | BTU_GAS | 1282 | | CALC_BBLS_H2O | 36 | | CALC_BBLS_OIL | 67 | | CALC_GOR | 7955 | | CALC_MCF_GAS | 533 | | CASING_PRESS | 430 | | GRAVITY_OIL | 57 | | MCF_GAS | 533 |
| | Perforation Data: | | Interval Top: | 7108 ft. | # Of Holes: | 128 | | Interval Bottom: | 7344 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/10/2025 Interval Top: 7108 ft. Interval Bottom: 7128 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/1/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/29/2013 | Treatment End Date: | 5/29/2013 | | Treatment Summary: | Refrac NB w/250,280# sand and 89,779 gal frac fluid 5/29/13.
| | Total fluid used in treatment (bbls): | 2138 | Max pressure during treatment (psi): | 4838 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 360 | | Fresh water used in treatment (bbls): | 2138 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250280 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7108 ft. | # Of Holes: | 40 | | Interval Bottom: | 7128 ft. | Hole Size: | 0.71 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2027 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|