|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/29/2019 Measured TD: 7970 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/29/2019 | | Wellbore Permit | DRIFTED | | Permit #: | 20000078 | Expiration Date: | 1/30/2002 | | Proposed Depth/Form: | 7970 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4000 ft., Bottom: 5100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/17/2000 | | Spud Date: | 3/12/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 7970 ft. | Measured PB depth: | 7921 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL IND GL/GR; CBL VDL GR; COMP DENS COMP NEUT GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 773 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 545, Top: 0 ft., Bottom: 773 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7962 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6430 ft., Bottom: 7962 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4252 ft. | | N | N | | SHANNON | 4812 ft. | | N | N | | NIOBRARA | 7064 ft. | | N | N | | FORT HAYS | 7340 ft. | | N | N | | CODELL | 7362 ft. | | N | N | | CARLILE | 7384 ft. | | N | N | | GREENHORN | 7414 ft. | | N | N | | BENTONITE | 7633 ft. | | N | N | | GRANEROS | 7634 ft. | | N | N | | MOWRY | 7787 ft. | | N | N | | J-2 SAND | 7802 ft. | | N | N | | SKULL CREEK | 7916 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/29/2019 Interval Top: 7804 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/17/2000 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BBLS_OIL | 10 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 110700 | | CALC_MCF_GAS | 1107 | | CASING_PRESS | 760 | | MCF_GAS | 1107 | | TUBING_PRESS | 550 |
| | Perforation Data: | | Interval Top: | 7804 ft. | # Of Holes: | 92 | | Interval Bottom: | 7860 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: GW Status: CM - 7/18/2013 Interval Top: 7364 ft. Interval Bottom: 7384 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/22/2001 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/4/2013 | Treatment End Date: | 6/4/2013 | | Treatment Summary: | Set CIBP @ 7440'. Frac'd the CD w/67,926 # sand and 30,031 gal (715 bbls) frac fluid. | | Total fluid used in treatment (bbls): | 715 | Max pressure during treatment (psi): | 4258 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 633 | | Fresh water used in treatment (bbls): | 715 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 67926 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 4/17/2000 | | Treatment Summary: | FRAC WELL WITH 10,000# 100 MESH, 300000# 20/40 FRAC SAND. 128,000 GALS VISTAR 22 LHT, 20 LHT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 25 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 2520 | | CALC_MCF_GAS | 63 | | CASING_PRESS | 180 | | MCF_GAS | 63 |
| | Perforation Data: | | Interval Top: | 7364 ft. | # Of Holes: | 80 | | Interval Bottom: | 7384 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 1/27/2009 Interval Top: 7364 ft. Interval Bottom: 7960 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 3/22/2001 | Choke Size: | 0.344 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/17/2000 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7336 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/5/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 33 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 33 | | CALC_GOR | 11545 | | CALC_MCF_GAS | 381 | | CASING_PRESS | 480 | | MCF_GAS | 381 | | TUBING_PRESS | 220 |
| | Perforation Data: | | Interval Top: | 7364 ft. | # Of Holes: | 172 | | Interval Bottom: | 7960 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/18/2013 Interval Top: 7150 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/29/2013 | Treatment End Date: | N/A | | Treatment Summary: | Well was commingled and turned to production 6/20/2013. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 4/17/2000 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CBP @ 7450' TO COMMINGLE THE JSND-NBRR-CDL. 02/25/09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7761 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/29/2013 | Test Method: | Flow | | Hours Tested: | 2 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 8 | | BTU_GAS | 1331 | | CALC_BBLS_H2O | 72 | | CALC_BBLS_OIL | 96 | | CALC_GOR | 5625 | | CALC_MCF_GAS | 540 | | CASING_PRESS | 736 | | GRAVITY_OIL | 56 | | MCF_GAS | 45 | | TUBING_PRESS | 379 |
| | Perforation Data: | | Interval Top: | 7150 ft. | # Of Holes: | 212 | | Interval Bottom: | 7860 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/29/2019 Interval Top: 7150 ft. Interval Bottom: 7384 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/21/2009 | | Treatment Summary: | NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7280' TO COMMINGLE THE NBRR-CDL. 01-22-09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7342 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/27/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 68 | | BBLS_OIL | 33 | | BTU_GAS | 1283 | | CALC_BBLS_H2O | 68 | | CALC_BBLS_OIL | 33 | | CALC_GOR | 6455 | | CALC_MCF_GAS | 213 | | CASING_PRESS | 769 | | GRAVITY_OIL | 56 | | MCF_GAS | 213 | | TUBING_PRESS | 187 |
| | Perforation Data: | | Interval Top: | 7150 ft. | # Of Holes: | 120 | | Interval Bottom: | 7384 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/24/2013 Interval Top: 7150 ft. Interval Bottom: 7170 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/25/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/4/2013 | Treatment End Date: | 6/4/2013 | | Treatment Summary: | Set CFP @ 7230'. Frac'd NB w/125,896 # sand and 56,606 gal (1348 bbls) frac fluid. | | Total fluid used in treatment (bbls): | 1348 | Max pressure during treatment (psi): | 4830 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 632 | | Fresh water used in treatment (bbls): | 1348 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 125896 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7150 ft. | # Of Holes: | 40 | | Interval Bottom: | 7170 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/29/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|