|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2020 Measured TD: 8160 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 1/30/2002 | | Proposed Depth/Form: | 8160 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 232 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 3/23/2000 | | Spud Date: | 2/21/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 8160 ft. | Measured PB depth: | 8121 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY, COMPENSATED NEUTON GR DUAL INDUCTION GUARD LOG GR, CBL GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 705 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 495, Top: 0 ft., Bottom: 705 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8156 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6640 ft., Bottom: 8156 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4534 ft. | | N | N | | SHANNON | 5050 ft. | | N | N | | NIOBRARA | 7107 ft. | | N | N | | FORT HAYS | 7377 ft. | | N | N | | CODELL | 7400 ft. | | N | N | | CARLILE | 7420 ft. | | N | N | | GREENHORN | 7463 ft. | | N | N | | BENTONITE | 7684 ft. | | N | N | | GRANEROS | 7685 ft. | | N | N | | MOWRY | 7840 ft. | | N | N | | J-2 SAND | 7855 ft. | | N | N | | SKULL CREEK | 7970 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7865 ft. Interval Bottom: 7918 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/23/2000 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 14 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 14 | | CALC_GOR | 51714 | | CALC_MCF_GAS | 724 | | CASING_PRESS | 650 | | MCF_GAS | 724 | | TUBING_PRESS | 560 |
| | Perforation Data: | | Interval Top: | 7865 ft. | # Of Holes: | 68 | | Interval Bottom: | 7918 ft. | Hole Size: | 0.3 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/25/2010 Interval Top: 7400 ft. Interval Bottom: 7418 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/23/2000 | | Treatment Summary: | FRAC CODELL WITH 10320 # 100 MESH, 1/2 PPG, 1 PPG. 302720 #20/40 FRAC SAND 1 PPG THRU 4 PPG IN 130500 VISTAR 22 # LHT 20 # |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/13/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 45 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 45 | | CALC_GOR | 3800 | | CALC_MCF_GAS | 171 | | CASING_PRESS | 210 | | MCF_GAS | 171 |
| | Perforation Data: | | Interval Top: | 7400 ft. | # Of Holes: | 36 | | Interval Bottom: | 7418 ft. | Hole Size: | 0.3 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 6/25/2010 Interval Top: 7400 ft. Interval Bottom: 7918 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.344 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/23/2000 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7860 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/16/2001 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 37 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 37 | | CALC_GOR | 11665 | | CALC_MCF_GAS | 432 | | CASING_PRESS | 550 | | MCF_GAS | 432 | | TUBING_PRESS | 280 |
| | Perforation Data: | | Interval Top: | 7400 ft. | # Of Holes: | 104 | | Interval Bottom: | 7918 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/7/2004 Interval Top: 7110 ft. Interval Bottom: 7918 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/23/2000 | | Treatment Summary: | DRILLED OUT CPB @ 7360 AND 7370' ON 05-05-04 TO COMMINGLE THE JSND-NB-CD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7862 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/7/2004 | Test Method: | FLOWING | | Hours Tested: | 22 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 28 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 6429 | | CALC_MCF_GAS | 180 | | CASING_PRESS | 600 | | MCF_GAS | 180 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 7110 ft. | # Of Holes: | 224 | | Interval Bottom: | 7918 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: PR - 9/1/2019 Interval Top: 7110 ft. Interval Bottom: 7418 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/16/2010 | | Treatment Summary: | NIOBRARA - REFRACD 7110-7320 WITH 139944 GAL FRAC FLUID AND 250480# SAND
CODELL - 7400-7418 WITH 125076 GAL FRAC FLUID AND 250560# SAND | | Formation Treatment | | Treatment Date: | 3/23/2000 | | Treatment Summary: | SET CBP @ 7370 03-29-04. SET CBP @ 7360' 04-04-04. FRAC'D NBRR 7110-7320' (120 HOLES) W/ 137,600 GAL FRAC FLUID AND 200,340# SAND, 04-07-04; FRAC'D CODL 7400-7418' (36 HOLES) W/ 10,320# 100 MESH AND 302,720# 20/40 SAND, 05-12-01 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7860 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/19/2010 | Test Method: | FLOWING | | Hours Tested: | 22 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 18 | | BBLS_OIL | 10 | | BTU_GAS | 1247 | | CALC_BBLS_H2O | 19 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 123545 | | CALC_MCF_GAS | 259 | | CASING_PRESS | 662 | | GRAVITY_OIL | 74 | | MCF_GAS | 243 | | TUBING_PRESS | 352 |
| | Perforation Data: | | Interval Top: | 7110 ft. | # Of Holes: | 156 | | Interval Bottom: | 7418 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 8477 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 4.012 |
| Average MCFE per Day | 23.260 |
| Federal Financial Assurance | i | |
|
|