|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2025 Measured TD: 8035 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2025 | | Wellbore Permit | | | Permit #: | 19990935 | Expiration Date: | 11/14/2001 | | Proposed Depth/Form: | 8035 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-466 , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 316, Drill Unit: S2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 405 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 285, Top: 0 ft., Bottom: 405 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8034 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 6680 ft., Bottom: 8034 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/23/2000 | | Spud Date: | 1/13/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 8035 ft. | Measured PB depth: | 7990 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL | | Log Types: | COM DEN, COM NEU/GR,DIGL/GR,CBL GR. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 405 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 285, Top: 0 ft., Bottom: 405 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8034 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6680 ft., Bottom: 8034 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 4500 ft., Depth: 5200 ft., Bottom: 5220 ft., Sacks: 245, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4100 ft., Depth: 4100 ft., Bottom: 4500 ft., Sacks: 90, Method: SQUEEZE | | Additional Cement: | String Type: SURF , Top: 440 ft., Depth: 1800 ft., Bottom: 1800 ft., Sacks: 375, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4297 ft. | | N | N | | SHANNON | 4830 ft. | | N | N | | NIOBRARA | 7160 ft. | | | | | FORT HAYS | 7407 ft. | | N | N | | CODELL | 7431 ft. | | | | | CARLILE | 7453 ft. | | N | N | | GREENHORN | 7475 ft. | | N | N | | BENTONITE | 7701 ft. | | N | N | | GRANEROS | 7702 ft. | | N | N | | MOWRY | 7855 ft. | | N | N | | J-2 SAND | 7870 ft. | | | | | J-3 SAND | 7895 ft. | | | | | SKULL CREEK | 7983 ft. | | N | N |
Formation JSND Formation Classification: OG Status: PR - 5/1/2025 Interval Top: 7874 ft. Interval Bottom: 7922 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/23/2000 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 106400 | | CALC_MCF_GAS | 532 | | CASING_PRESS | 340 | | MCF_GAS | 532 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7874 ft. | # Of Holes: | 96 | | Interval Bottom: | 7922 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/16/2001 Interval Top: 7430 ft. Interval Bottom: 7452 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/9/2001 | Choke Size: | 0.250 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/23/2000 | | Treatment Summary: | FRAC WELL W/10880# 100 MESH, STAGED 1/2# & 1#. 301020# 20/40 STAGED 1# THRU 4# IN 126462 GALS VISTAR 22 LHT, 22 & 20# |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/4/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 43 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 43 | | CALC_GOR | 2558 | | CALC_MCF_GAS | 110 | | CASING_PRESS | 300 | | MCF_GAS | 110 |
| | Perforation Data: | | Interval Top: | 7430 ft. | # Of Holes: | 44 | | Interval Bottom: | 7452 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 7/31/2001 Interval Top: 7430 ft. Interval Bottom: 7922 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 3/27/2001 | Choke Size: | 0.344 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/23/2000 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7847 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/25/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 27 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 15333 | | CALC_MCF_GAS | 414 | | CASING_PRESS | 600 | | MCF_GAS | 414 | | TUBING_PRESS | 360 |
| | Perforation Data: | | Interval Top: | 7430 ft. | # Of Holes: | 124 | | Interval Bottom: | 7922 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OG Status: CM - 6/11/2011 Interval Top: 7212 ft. Interval Bottom: 7922 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/11/2011 | | Treatment Summary: | CFP SET @ 7360' ON 5/23/11; DRILLED OUT 6/2/11. CIBP SET @ 7480' ON 5-23-11; DRILLED OUT 6/3/11. TUBING SET @ 7862' ON 6/6/11. COMMINGLED ON 6/8/11. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7862 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/11/2011 | Test Method: | FLOWING | | Hours Tested: | 14 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 40 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 48 | | CALC_BBLS_OIL | 69 | | CALC_GOR | 5217 | | CALC_MCF_GAS | 360 | | CASING_PRESS | 562 | | GRAVITY_OIL | 51 | | MCF_GAS | 210 | | TUBING_PRESS | 354 |
| | Perforation Data: | | Interval Top: | 7212 ft. | # Of Holes: | 208 | | Interval Bottom: | 7922 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OG Status: PR - 5/1/2025 Interval Top: 7212 ft. Interval Bottom: 7452 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/19/2007 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/23/2011 | | Treatment Summary: | NBRR: FRAC'D 7212'-7228 W/135,282 GAL FRAC FLUID AND 250,480# SAND.
CD: FRAC'D 7432-7452 W/123,060 GAL FRAC FLUID AND 250,560# SAND.
CFP SET @ 7360' ON 5/23/11; DRILLED OUT 6/2/11. CIBP SET @ 7480' ON 5-23-11; DRILLED OUT 6/3/11
| | Formation Treatment | | Treatment Date: | 7/19/2007 | | Treatment Summary: | NBRR-CODL; RECOMPLETED. SEP CFP @ 7560' 07/15/2007. FRAC'D THE CODL W/140,322 GAL FRAC FLUID AND 245,120# SAND 07/19/2007. SET CFP @ 7350' 07/19/07. FRACD THE NBRR W/183,789 GAL FRAC FLUID AND 250,160# SND 07/19/2007. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 26 | | BTU_GAS | 1237 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 26 | | CALC_GOR | 7115 | | CALC_MCF_GAS | 185 | | CASING_PRESS | 737 | | GRAVITY_OIL | 47 | | MCF_GAS | 185 | | TUBING_PRESS | 192 |
| | Perforation Data: | | Interval Top: | 7212 ft. | # Of Holes: | 112 | | Interval Bottom: | 7452 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 55 |
| Total Gas Produced (MCF) | 11774 |
| GOR | 214072 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.671 |
| Average MCFE per Day | 32.906 |
| Federal Financial Assurance | i | |
|
|