Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19862
Well Classification: GW Status: PR - 5/1/2025
Well Name/No:SHELEY #23-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:256466LocationID:330914
Municipality/County:FIRESTONE / WELD #123Location:NESW 4 2N67W 6
Field:SPINDLE - #77900Elevation:4894 ft.
Planned Location:2180FSL  2150 FWLLat/Long: 40.165936 / -104.896964Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.166059 / -104.896714Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/23/2011
End Date: 5/23/2011
Reported: 2/1/2012
Prior to rule 205A.b.(2)(A)
Days to report: 254
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2025             Measured TD: 8035 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2025
Wellbore Permit
Permit #:19990935 Expiration Date:11/14/2001
Proposed Depth/Form:8035 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-466 , Unit Acreage: 160, Drill Unit: SW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 316, Drill Unit: S2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 405 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 285, Top: 0 ft., Bottom: 405 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8034 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 6680 ft., Bottom: 8034 ft.

Wellbore Completed
Completion Date:2/23/2000
Spud Date:1/13/2000Spud Date Is:ACTUAL
Measured TD:8035 ft.Measured PB depth:7990 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Log Types:COM DEN, COM NEU/GR,DIGL/GR,CBL GR.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 405 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 405 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8034 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6680 ft., Bottom: 8034 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 4500 ft., Depth: 5200 ft., Bottom: 5220 ft., Sacks: 245, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4100 ft., Depth: 4100 ft., Bottom: 4500 ft., Sacks: 90, Method: SQUEEZE
Additional Cement:String Type: SURF , Top: 440 ft., Depth: 1800 ft., Bottom: 1800 ft., Sacks: 375, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
SUSSEX4297 ft.NN
SHANNON4830 ft.NN
NIOBRARA7160 ft.
FORT HAYS7407 ft.NN
CODELL7431 ft.
CARLILE7453 ft.NN
GREENHORN7475 ft.NN
BENTONITE7701 ft.NN
GRANEROS7702 ft.NN
MOWRY7855 ft.NN
J-2 SAND7870 ft.
J-3 SAND7895 ft.
SKULL CREEK7983 ft.NN

Formation JSND                     Formation Classification:  OG                     Status:  PR - 5/1/2025                  Interval Top: 7874 ft.    Interval Bottom: 7922 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/23/2000
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 5
CALC_BBLS_H2O 30
CALC_BBLS_OIL 5
CALC_GOR 106400
CALC_MCF_GAS 532
CASING_PRESS 340
MCF_GAS 532
TUBING_PRESS 200
Perforation Data:
Interval Top:7874 ft.# Of Holes:96
Interval Bottom:7922 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/16/2001                 Interval Top: 7430 ft.    Interval Bottom: 7452 ft.

 Completed Information for Formation CODELL
1st Production Date:1/9/2001Choke Size:0.250 in.
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/23/2000
Treatment Summary:FRAC WELL W/10880# 100 MESH, STAGED 1/2# & 1#. 301020# 20/40 STAGED 1# THRU 4# IN 126462 GALS VISTAR 22 LHT, 22 & 20#
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/4/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 43
CALC_BBLS_H2O 12
CALC_BBLS_OIL 43
CALC_GOR 2558
CALC_MCF_GAS 110
CASING_PRESS 300
MCF_GAS 110
Perforation Data:
Interval Top:7430 ft.# Of Holes:44
Interval Bottom:7452 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 7/31/2001                 Interval Top: 7430 ft.    Interval Bottom: 7922 ft.

 Completed Information for Formation J-CODELL
1st Production Date:3/27/2001Choke Size:0.344 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/23/2000
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7847 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/25/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 27
CALC_BBLS_H2O 10
CALC_BBLS_OIL 27
CALC_GOR 15333
CALC_MCF_GAS 414
CASING_PRESS 600
MCF_GAS 414
TUBING_PRESS 360
Perforation Data:
Interval Top:7430 ft.# Of Holes:124
Interval Bottom:7922 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OG                   Status:  CM - 6/11/2011                 Interval Top: 7212 ft.    Interval Bottom: 7922 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/11/2011
Treatment Summary:CFP SET @ 7360' ON 5/23/11; DRILLED OUT 6/2/11. CIBP SET @ 7480' ON 5-23-11; DRILLED OUT 6/3/11. TUBING SET @ 7862' ON 6/6/11. COMMINGLED ON 6/8/11.
Tubing Size:2.375 in.Tubing Setting Depth:7862 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/11/2011Test Method:FLOWING
Hours Tested:14Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 40
BTU_GAS 1
CALC_BBLS_H2O 48
CALC_BBLS_OIL 69
CALC_GOR 5217
CALC_MCF_GAS 360
CASING_PRESS 562
GRAVITY_OIL 51
MCF_GAS 210
TUBING_PRESS 354
Perforation Data:
Interval Top:7212 ft.# Of Holes:208
Interval Bottom:7922 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OG                   Status:  PR - 5/1/2025                  Interval Top: 7212 ft.    Interval Bottom: 7452 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/19/2007Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/23/2011
Treatment Summary:NBRR: FRAC'D 7212'-7228 W/135,282 GAL FRAC FLUID AND 250,480# SAND. CD: FRAC'D 7432-7452 W/123,060 GAL FRAC FLUID AND 250,560# SAND. CFP SET @ 7360' ON 5/23/11; DRILLED OUT 6/2/11. CIBP SET @ 7480' ON 5-23-11; DRILLED OUT 6/3/11
Formation Treatment
Treatment Date:7/19/2007
Treatment Summary:NBRR-CODL; RECOMPLETED. SEP CFP @ 7560' 07/15/2007. FRAC'D THE CODL W/140,322 GAL FRAC FLUID AND 245,120# SAND 07/19/2007. SET CFP @ 7350' 07/19/07. FRACD THE NBRR W/183,789 GAL FRAC FLUID AND 250,160# SND 07/19/2007.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 26
BTU_GAS 1237
CALC_BBLS_H2O 15
CALC_BBLS_OIL 26
CALC_GOR 7115
CALC_MCF_GAS 185
CASING_PRESS 737
GRAVITY_OIL 47
MCF_GAS 185
TUBING_PRESS 192
Perforation Data:
Interval Top:7212 ft.# Of Holes:112
Interval Bottom:7452 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)45
Total Gas Produced (MCF)7458
GOR165733
GOR DeterminationMCFE
Average BOE per Day3.622
Average MCFE per Day21.032

 Federal Financial Assurance  i 

 Tribal Well  i No