Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19854
Well Classification: GW Status: PA - 5/20/2019
Well Name/No:ECHEVERRIA #11-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/20/2019
FacilityID:256362LocationID:330909
County:WELD #123Location:NWNW 2 2N67W 6
Field:WATTENBERG - #90750Elevation:4880 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:465FNL  460 FWLLat/Long: 40.173147 / -104.865513Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.173230 / -104.865291Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 5/20/2019             Measured TD: 8010 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 5/20/2019
Wellbore PermitDRIFTED
Permit #:19990896 Expiration Date:1/29/2002
Proposed Depth/Form:8010 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5070 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 4000 ft., Bottom: 5070 ft.

Wellbore Completed
Completion Date:12/24/1999
Spud Date:11/24/1999Spud Date Is:ACTUAL
Measured TD:8010 ft.Measured PB depth:7960 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY,COMPENSATED NEUTRON GR;DUAL INDUCTION GUARD LOG GR;CBL GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 744 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 445, Top: 0 ft., Bottom: 744 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8007 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 6576 ft., Bottom: 8007 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4302 ft.NN
SHANNON4842 ft.NN
NIOBRARA7142 ft.NN
FORT HAYS7374 ft.NN
CODELL7397 ft.NN
CARLILE7418 ft.NN
GREENHORN7446 ft.NN
BENTONITE7664 ft.NN
GRANEROS7665 ft.NN
MOWRY7816 ft.NN
J-2 SAND7830 ft.NN
SKULL CREEK7944 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 5/20/2019                 Interval Top: 7834 ft.    Interval Bottom: 7890 ft.

 Completed Information for Formation J SAND
1st Production Date:12/25/1999Choke Size:0.437 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/24/1999
Treatment Summary:FRAC WELL WITH 550880# 20/40 FRAC SAND 1PPG THRU 5PPG, IN 227207 GALS PRIMAGEL G FRAC GEL 17,25.
Tubing Size:2.375 in.Tubing Setting Depth:7840 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/23/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 37
BBLS_OIL 5
CALC_BBLS_H2O 37
CALC_BBLS_OIL 5
CALC_GOR 191200
CALC_MCF_GAS 956
CASING_PRESS 550
MCF_GAS 956
TUBING_PRESS 290
Perforation Data:
Interval Top:7834 ft.# Of Holes:76
Interval Bottom:7890 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/31/2001                 Interval Top: 7396 ft.    Interval Bottom: 7416 ft.

 Completed Information for Formation CODELL
1st Production Date:4/2/2001Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/24/1999
Treatment Summary:FRAC CODELL WITH 11680# 100 MESH, 1/2 PPG & 1 PPG. 301360 # 20/40 FRAC SAND 1 PPG THRU 4 PPG. IN 130000 GALS VISTAR 22
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/2/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 38
CALC_BBLS_H2O 13
CALC_BBLS_OIL 38
CALC_GOR 3526
CALC_MCF_GAS 134
CASING_PRESS 230
MCF_GAS 134
Perforation Data:
Interval Top:7396 ft.# Of Holes:80
Interval Bottom:7416 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 9/9/2001                  Interval Top: 7396 ft.    Interval Bottom: 7890 ft.

 Completed Information for Formation J-CODELL
1st Production Date:6/13/2001Choke Size:0.375 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/24/1999
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7815 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/13/2001Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 27
CALC_BBLS_H2O 9
CALC_BBLS_OIL 27
CALC_GOR 23996
CALC_MCF_GAS 653
CASING_PRESS 450
MCF_GAS 657
TUBING_PRESS 200
Perforation Data:
Interval Top:7396 ft.# Of Holes:156
Interval Bottom:7890 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/28/2009                Interval Top: 7160 ft.    Interval Bottom: 7890 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/24/1999
Treatment Summary:JSND-NBRR-CDL COMMINGLE - DRILLED UP CBP'S TO COMMINGLE THE JSND-NBRR-CDL 10/23/09.
Tubing Size:2.375 in.Tubing Setting Depth:7822 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/28/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 26
BBLS_OIL 81
BTU_GAS 1263
CALC_BBLS_H2O 26
CALC_BBLS_OIL 81
CALC_GOR 14790
CALC_MCF_GAS 388
CASING_PRESS 915
GRAVITY_OIL 52
MCF_GAS 388
TUBING_PRESS 515
Perforation Data:
Interval Top:7160 ft.# Of Holes:220
Interval Bottom:7890 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/20/2019                 Interval Top: 7160 ft.    Interval Bottom: 7416 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/16/2009
Treatment Summary:NBRR-CDL RECOMPLETION- SET CBP@7530'. RE-RAC'D THE CODELL WITH 250,600# 20/40 SAND IN 112,392 GAL OF VISTAR 26 X LINKED GEL. 9/16/09. SET CBP @ 7260'. 9/18/09. RE-FRAC'D THE NIOBRARA WITH 250,560# 20/40 SAND AND 3671 BBLS VISTAR 22 XLF. 9/22/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7160 ft.# Of Holes:140
Interval Bottom:7416 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/20/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No