Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19789
Well Classification: GW Status: PR - 2/1/2025
Well Name/No:BARCLAY CRISMAN #14-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2025
FacilityID:256656LocationID:330862
County:WELD #123Location:SWSW 20 3N66W 6
Field:WATTENBERG - #90750Elevation:4910 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:656FSL  461 FWLLat/Long: 40.204798 / -104.808880Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.204777 / -104.809054Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2025             Measured TD: 7995 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2025
Wellbore PermitDRIFTED
Permit #:20030843 Expiration Date:5/20/2004
Proposed Depth/Form:7995 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW4
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: 318A , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407,407-66, Unit Acreage: 160, Drill Unit: SW4

Wellbore Completed
Completion Date:11/22/1999
Spud Date:10/29/1999Spud Date Is:ACTUAL
Measured TD:7995 ft.Measured PB depth:7954 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIGL/GR; CBL/GR; CDCN/GR.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 600 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7995 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 6236 ft., Bottom: 7995 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4320 ft.NN
SHANNON4900 ft.NN
NIOBRARA7138 ft.NN
FORT HAYS7352 ft.NN
CODELL7375 ft.NN
CARLILE7395 ft.NN
GREENHORN7430 ft.NN
BENTONITE7648 ft.NN
GRANEROS7649 ft.NN
MOWRY7800 ft.NN
J-2 SAND7816 ft.NN
J-3 SAND7837 ft.NN
SKULL CREEK7932 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  PR - 2/1/2025                  Interval Top: 7818 ft.    Interval Bottom: 7878 ft.

 Completed Information for Formation J SAND
1st Production Date:11/23/1999Choke Size:0.312 in.
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/22/1999
Treatment Summary:FRAC'D THE J SAND W/221,000 GAL SATURN I; 550,160# 20/40 SAND 1 PPG THRU 5 PPG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/22/1999Test Method:FLOWING
Hours Tested:4Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 24
BBLS_OIL 13
CALC_BBLS_H2O 144
CALC_BBLS_OIL 78
CALC_GOR 70923
CALC_MCF_GAS 5532
CASING_PRESS 340
MCF_GAS 922
Perforation Data:
Interval Top:7818 ft.# Of Holes:96
Interval Bottom:7878 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/30/2004                 Interval Top: 7376 ft.    Interval Bottom: 7394 ft.

 Completed Information for Formation CODELL
1st Production Date:8/24/2001Choke Size:0.187 in.
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/22/1999
Treatment Summary:FRAC'D W/302,060# 20/40 FRAC SAND IN 126,950 GALS 22# & 20# PHOENIX GEL. FLOW BACK FRAC. 8-23-2001.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/23/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 27
CALC_BBLS_H2O 9
CALC_BBLS_OIL 27
CALC_GOR 8349
CALC_MCF_GAS 225
CASING_PRESS 160
MCF_GAS 225
Perforation Data:
Interval Top:7376 ft.# Of Holes:36
Interval Bottom:7394 ft.Hole Size:0.42 in.

Formation J-CDL                   Formation Classification:  OW                   Status:  CM - 3/11/2002                 Interval Top: 7376 ft.    Interval Bottom: 7878 ft.

 Completed Information for Formation J-CODELL
1st Production Date:2/9/2002Choke Size:0.375 in.
Formation Name:J-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/22/1999
Treatment Summary:DRILL OUT CIBP. RUN PROD TBG. SWAB BACK WELL.
Tubing Size:2.375 in.Tubing Setting Depth:7795 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/11/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 11
CALC_BBLS_H2O 2
CALC_BBLS_OIL 11
CALC_GOR 8351
CALC_MCF_GAS 95
CASING_PRESS 675
MCF_GAS 95
TUBING_PRESS 300
Perforation Data:
Interval Top:7376 ft.# Of Holes:132
Interval Bottom:7878 ft.Hole Size:

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/25/2009                Interval Top: 7170 ft.    Interval Bottom: 7878 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/22/1999
Treatment Summary:JSND-NBRR-CDL COMMINGLE, DRILLED UP CBP @ 7360' TO COMMINGLE THE JSND-NBRR-CDL. 10/18/09.
Tubing Size:2.375 in.Tubing Setting Depth:7793 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/25/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 28
BTU_GAS 1239
CALC_BBLS_H2O 13
CALC_BBLS_OIL 28
CALC_GOR 5357
CALC_MCF_GAS 150
CASING_PRESS 1087
GRAVITY_OIL 53
MCF_GAS 150
TUBING_PRESS 306
Perforation Data:
Interval Top:7170 ft.# Of Holes:252
Interval Bottom:7878 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 2/1/2025                  Interval Top: 7170 ft.    Interval Bottom: 7394 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/22/1999
Treatment Summary:SET CBP @ 74401'. 09/10/09. RE-FRAC'D THE CODELL WITH 250,150# 20/40 SAND IN 137,130 GAL OF VISTAR 26-18 GEL. 9/14/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7170 ft.# Of Holes:156
Interval Bottom:7394 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/30/2004                 Interval Top: 7170 ft.    Interval Bottom: 7300 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/22/1999
Treatment Summary:NBRR RECOMPLETION: SET CIBP@7350'. FRAC'D W/136,100 GAL FRAC FLUID AND 168,856# 20/40 SAND. 03-14-2004.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/22/2004Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 28
CALC_BBLS_H2O 11
CALC_BBLS_OIL 28
CALC_GOR 3893
CALC_MCF_GAS 109
CASING_PRESS 110
MCF_GAS 109
Perforation Data:
Interval Top:7170 ft.# Of Holes:120
Interval Bottom:7300 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)597
GOR
GOR DeterminationMCFE
Average BOE per Day0.283
Average MCFE per Day1.627

 Federal Financial Assurance  i 

 Tribal Well  i No