Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19774
Well Classification: GW Status: PA - 7/17/2018
Well Name/No:DECHANT STATE V #16-14 Ji
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:72/3317-S
Facility Status:PAStatus Date7/17/2018
FacilityID:89469LocationID:330854
County:WELD #123Location:SESW 16 2N67W 6
Field:WATTENBERG - #90750Elevation:4989 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:475FSL  2160 FWLLat/Long: 40.132327 / -104.897643Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.132544 / -104.897472Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 7/17/2018             Measured TD: 8203 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 7/17/2018
Wellbore Permit
Permit #:20021548 Expiration Date:8/18/2003
Proposed Depth/Form:7595 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/24/2006
Spud Date:2/24/2000Spud Date Is:ACTUAL
Measured TD:8203 ft.Measured PB depth:8163 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DENSITY/NEUTRON,CALIPER,INDUCTION,CBL,MICRO
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 619 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 455, Top: 0 ft., Bottom: 619 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8191 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6984 ft., Bottom: 8191 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8096 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 3980 ft., Bottom: , Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5254 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 3982 ft., Bottom: 5262 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4400 ft.NN
SHANNON5028 ft.NN
NIOBRARA7320 ft.NN
COALMONT7575 ft.NN
J SAND8008 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 7/17/2018                 Interval Top: 8006 ft.    Interval Bottom: 8056 ft.

 Completed Information for Formation J SAND
1st Production Date:4/12/2000Choke Size:0.375 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:8/24/2006
Treatment Summary:147,252 GALS FLUID & 350,800# 20/40
Tubing Size:2.375 in.Tubing Setting Depth:8005 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/12/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 0
CALC_BBLS_H2O 4
CALC_BBLS_OIL 0
CALC_MCF_GAS 45
CASING_PRESS 500
MCF_GAS 45
TUBING_PRESS 260
Perforation Data:
Interval Top:8006 ft.# Of Holes:96
Interval Bottom:8056 ft.Hole Size:0.34 in.

Formation CODL                     Formation Classification:  GW                     Status:  AB - 7/17/2018                 Interval Top: 7577 ft.    Interval Bottom: 7595 ft.

 Completed Information for Formation CODELL
1st Production Date:11/25/2002Choke Size:0.218 in.
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:8/24/2006
Treatment Summary:ORIGINAL COMPLETION (11/02): 132,258 GALS VISTAR 22/20# GEL & 245,540# 20/40 OTTAWA SAND. REFRAC 5/10/04: 131,796 GAL VISTAR 26/27# GEL & 244,420# 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7563 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/8/2004Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 25
CALC_BBLS_H2O 6
CALC_BBLS_OIL 25
CALC_GOR 4360
CALC_MCF_GAS 109
CASING_PRESS 750
GRAVITY_OIL 45.2
MCF_GAS 109
TUBING_PRESS 450
Perforation Data:
Interval Top:7577 ft.# Of Holes:72
Interval Bottom:7595 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 9/12/2006                 Interval Top: 7577 ft.    Interval Bottom: 8054 ft.

 Completed Information for Formation J-CODELL
1st Production Date:8/29/2006Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7981 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/12/2006Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 2
BTU_GAS 1201
CALC_GOR 25000
CASING_PRESS 500
GRAVITY_OIL 46
MCF_GAS 50
TUBING_PRESS 450
Perforation Data:
Interval Top:7577 ft.# Of Holes:168
Interval Bottom:8054 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/17/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No