|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/13/2023 Measured TD: 8015 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/13/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 19990264 | Expiration Date: | 5/3/2000 | | Proposed Depth/Form: | 8028 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: 318A;232 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | 6/28/1999 | | Spud Date: | 6/1/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 8015 ft. | Measured PB depth: | 7980 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CD, NEU GR; DIGL/GR,CBL,CCL,GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 680 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 410, Top: 0 ft., Bottom: 680 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8008 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6670 ft., Bottom: 8008 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4459 ft. | | N | N | | SHANNON | 4963 ft. | | N | N | | NIOBRARA | 7145 ft. | | N | N | | FORT HAYS | 7368 ft. | | N | N | | CODELL | 7392 ft. | | N | N | | CARLILE | 7412 ft. | | N | N | | GREENHORN | 7447 ft. | | N | N | | BENTONITE | 7669 ft. | | N | N | | GRANEROS | 7670 ft. | | N | N | | MOWRY | 7821 ft. | | N | N | | J-2 SAND | 7836 ft. | | N | N | | J-3 SAND | 7861 ft. | | N | N | | SKULL CREEK | 7958 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 3/13/2023 Interval Top: 7840 ft. Interval Bottom: 7902 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/29/1999 | Choke Size: | 0.313 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/28/1999 | | Treatment Summary: | FRAC'D WELL W/500,080# 20/40 FRAC SAND IN 176,000 GALS FRAC GEL 27# HT & 25# |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7830 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/28/1999 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 83000 | | CALC_MCF_GAS | 332 | | CASING_PRESS | 310 | | MCF_GAS | 332 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7840 ft. | # Of Holes: | 104 | | Interval Bottom: | 7902 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/13/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|