|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/17/2024 Measured TD: 8025 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/17/2024 | | Wellbore Permit | DRIFTED | | Permit #: | 19990191 | Expiration Date: | 4/5/2000 | | Proposed Depth/Form: | 8025 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: 232,499 , Unit Acreage: 320, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/8/1999 | | Spud Date: | 10/10/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 8025 ft. | Measured PB depth: | 7966 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIGL/GR; CBL VCL CCL/GR; CD&CN/GR. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 638 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 383, Top: 0 ft., Bottom: 638 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8007 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 6690 ft., Bottom: 8007 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5116 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 3720 ft., Bottom: 5130 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4260 ft. | | N | N | | SHANNON | 4828 ft. | | N | N | | GRANEROS | 7116 ft. | | N | N | | NIOBRARA | 7196 ft. | | N | N | | FORT HAYS | 7440 ft. | | N | N | | CODELL | 7462 ft. | | N | N | | CARLILE | 7484 ft. | | N | N | | GREENHORN | 7497 ft. | | N | N | | BENTONITE | 7715 ft. | | N | N | | MOWRY | 7870 ft. | | N | N | | J SAND | 7885 ft. | | N | N | | SKULL CREEK | 7982 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 4/17/2024 Interval Top: 7887 ft. Interval Bottom: 7932 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/8/1999 | Choke Size: | 0.281 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/8/1999 | | Treatment Summary: | 227,027 GALS PRIMAGEL G FRACGEL 27-25, W/ 550,940# 20/40 FRAC SAND 1 PPG THRU 5 PPG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/8/1999 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 124250 | | CALC_MCF_GAS | 497 | | CASING_PRESS | 325 | | MCF_GAS | 497 |
| | Perforation Data: | | Interval Top: | 7887 ft. | # Of Holes: | 74 | | Interval Bottom: | 7932 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/17/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|