Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19748
Well Classification: GW Status: TA - 11/24/2020
Well Name/No:HERMAN #34-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date11/24/2020
FacilityID:89443LocationID:330843
County:WELD #123Location:SWSE 8 2N66W 6
Field:WATTENBERG - #90750Elevation:4869 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:844FSL  1796 FELLat/Long: 40.147547 / -104.798020Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.147676 / -104.798143Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/16/2012
End Date: 1/16/2012
Reported: 7/31/2012
Prior to rule 205A.b.(2)(A)
Days to report: 197
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 11/24/2020             Measured TD: 7982 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 11/24/2020
Wellbore Permit
Permit #:20020360 Expiration Date:3/6/2003
Proposed Depth/Form:8030 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:5/15/2001
Spud Date:3/27/2001Spud Date Is:ACTUAL
Measured TD:7982 ft.Measured PB depth:7958 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY,COMPENSATED NEUTRON GR DUAL IND. GUARD LOG GR; CBL VDL GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 721 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 505, Top: 0 ft., Bottom: 721 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7974 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 6550 ft., Bottom: 7974 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4853 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 4130 ft., Bottom: 4853 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4853 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 4130 ft., Bottom: 4853 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4354 ft.NN
SHANNON4977 ft.NN
NIOBRARA7128 ft.NN
FORT HAYS7346 ft.NN
CODELL7369 ft.NN
CARLILE7380 ft.NN
GREENHORN7427 ft.NN
GRANEROS7639 ft.NN
BENTONITE7639 ft.NN
MOWRY7791 ft.NN
J-2 SAND7815 ft.NN
SKULL CREEK7916 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  TA - 11/24/2020                Interval Top: 7828 ft.    Interval Bottom: 7866 ft.

 Completed Information for Formation J SAND
1st Production Date:5/15/2001Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/15/2001
Treatment Summary:FRAC WELL WITH 227,366 GALS FRAC GEL 22# HT & 20#. IN 550,000# 20/40 FRAC SAND. 1 PPG THRU 5 PPG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 34
BBLS_OIL 2
CALC_GOR 122417
CASING_PRESS 450
MCF_GAS 294
TUBING_PRESS 270
Perforation Data:
Interval Top:7828 ft.# Of Holes:76
Interval Bottom:7866 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/30/2012                 Interval Top: 7373 ft.    Interval Bottom: 7385 ft.

 Completed Information for Formation CODELL
1st Production Date:4/5/2002Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/25/2012
Treatment Summary:CIBP set @ 7425 on 1/19/12; drilled out 3/1/12 Refrac 7373-7385 w/ 122,934 gal frac fluid and 252,620 # sand (1/25/12)
Formation Treatment
Treatment Date:5/15/2001
Treatment Summary:SET RBP @ 7388'. PERF THE CODELL FROM 7373'-7385' W/4 SPF. FRAC W/241,400# 20/40 SAND IN 116,634 GALS DYNAFLOW-2. RUN ;
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 22
CALC_GOR 4393
CASING_PRESS 200
MCF_GAS 98
Perforation Data:
Interval Top:7373 ft.# Of Holes:48
Interval Bottom:7385 ft.Hole Size:0.43 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 11/21/2002                Interval Top: 7373 ft.    Interval Bottom: 7866 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/15/2001
Treatment Summary:RETRIEVE RBP. RESET TBG. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7817 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 9
CALC_BBLS_H2O 17
CALC_BBLS_OIL 9
CALC_GOR 51111
CALC_MCF_GAS 460
CASING_PRESS 430
MCF_GAS 460
TUBING_PRESS 200
Perforation Data:
Interval Top:7373 ft.# Of Holes:124
Interval Bottom:7866 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/30/2012                 Interval Top: 7189 ft.    Interval Bottom: 7866 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/15/2001
Treatment Summary:JSND-NBRR-CDL COMMINGLE RELEASED RFP @ 7290'. 03-16-09. RELEASED RBP @ 7470' TO COMMINGLE THE JSND-NBRR-CDL. 03-17-09.
Tubing Size:2.375 in.Tubing Setting Depth:7806 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/10/2012Test Method:Flow
Hours Tested:10Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 18
BTU_GAS 1
CALC_BBLS_H2O 24
CALC_BBLS_OIL 43
CALC_GOR 14000
CALC_MCF_GAS 605
CASING_PRESS 540
GRAVITY_OIL 57
MCF_GAS 252
TUBING_PRESS 520
Perforation Data:
Interval Top:7189 ft.# Of Holes:164
Interval Bottom:7866 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  TA - 11/24/2020                Interval Top: 7189 ft.    Interval Bottom: 7385 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/17/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/2/2009
Treatment Summary:NBRR-CDL REFRAC AND RECOMPLETION SET RBP @ 7470'. 02-23-09. RE-FRAC'D THE CODELL WITH 108,864 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,260# 20/40 SAND. 03-02-09 SET RFP @ 7290'. 03-02-09. FRAC'D THE NIOBRARA WITH 140,658 GAL (CONT.)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7189 ft.# Of Holes:88
Interval Bottom:7385 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/24/2012                Interval Top: 7189 ft.    Interval Bottom: 7209 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/17/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/25/2012
Treatment Summary:CBP set @ 7290 on 1/20/12; drilled out 3/1/12 Refrac 7189 – 7209 w/ 133,142 gal frac fluid and 252,360 # sand (1/25/12)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7189 ft.# Of Holes:40
Interval Bottom:7209 ft.Hole Size:
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
05/31/2020
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No