|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/7/2025 Measured TD: 8081 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/7/2025 | | Wellbore Permit | | | Permit #: | 19990047 | Expiration Date: | 1/28/2000 | | Proposed Depth/Form: | 8090 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: 232,499 , Unit Acreage: 316, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 3/1/1999 | | Spud Date: | 2/3/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 8081 ft. | Measured PB depth: | 8053 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY COMPENSATED NEUTRON GR DUAL INDUCTION GUARD LOG GR; GR CBL VDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 513 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 513 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8076 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 6730 ft., Bottom: 8076 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4364 ft. | | | | | SHANNON | 4924 ft. | | | | | NIOBRARA | 7240 ft. | | | | | FORT HAYS | 7481 ft. | | | | | CODELL | 7503 ft. | | | | | CARLILE | 7526 ft. | | | | | GREENHORN | 7548 ft. | | | | | BENTONITE | 7770 ft. | | | | | GRANEROS | 7771 ft. | | | | | MOWRY | 7922 ft. | | | | | J SAND | 7937 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 1/7/2025 Interval Top: 7944 ft. Interval Bottom: 7990 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/1/1999 | | Treatment Summary: | SEE SCAN DOCUMENT |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 39 | | BBLS_OIL | 9 | | CALC_BBLS_H2O | 39 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 107444 | | CALC_MCF_GAS | 967 | | CASING_PRESS | 485 | | MCF_GAS | 967 | | TUBING_PRESS | 240 |
| | Perforation Data: | | Interval Top: | 7944 ft. | # Of Holes: | 72 | | Interval Bottom: | 7990 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/07/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|