|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/25/2018 Measured TD: 7922 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/25/2018 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 11/18/2000 | | Proposed Depth/Form: | 7940 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-466 , Unit Acreage: 160, Drill Unit: SE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 2/1/1999 | | Spud Date: | 1/8/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 7922 ft. | Measured PB depth: | 7886 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 399 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 399 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7922 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 6406 ft., Bottom: 7922 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4215 ft. | | | | | SHANNON | 4791 ft. | | | | | NIOBRARA | 7079 ft. | | | | | FORT HAYS | 7316 ft. | | | | | CODELL | 7340 ft. | | | | | CARLILE | 7362 ft. | | | | | GREENHORN | 7390 ft. | | | | | BENTONITE | 7610 ft. | | | | | GRANEROS | 7611 ft. | | | | | MOWRY | 7764 ft. | | | | | J SAND | 7778 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 4/10/2018 Interval Top: 7783 ft. Interval Bottom: 7838 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/1/1999 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7783 ft. | # Of Holes: | 82 | | Interval Bottom: | 7838 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 9/1/1999 Interval Top: 7340 ft. Interval Bottom: 7838 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/1/1999 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7773 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/27/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 47500 | | CALC_MCF_GAS | 570 | | CASING_PRESS | 310 | | MCF_GAS | 570 | | TUBING_PRESS | 540 |
| | Perforation Data: | | Interval Top: | 7340 ft. | # Of Holes: | 122 | | Interval Bottom: | 7838 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OG Status: CM - 7/12/2013 Interval Top: 7118 ft. Interval Bottom: 7360 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/1/1999 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/3/2013 | Treatment End Date: | 6/3/2013 | | Treatment Summary: | Set CIBP @ 7480'. Frac Codell with 250,720# sand and 78,939 gal (1879.5 bbls) frac fluid. Drill up CIBP. | | Total fluid used in treatment (bbls): | 1880 | Max pressure during treatment (psi): | 5095 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1286 | | Fresh water used in treatment (bbls): | 1880 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250720 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 2/1/1999 | | Treatment Summary: | FRAC WELL WITH 10,000# 100 MESH, 1/2 PPG,1PPG, 300,000# 20/40 SAND 1PPG THRU 4PPGIN 176736 GAL SATURN 1 30. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 35 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 4029 | | CALC_MCF_GAS | 141 | | CASING_PRESS | 550 | | MCF_GAS | 141 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 7118 ft. | # Of Holes: | 120 | | Interval Bottom: | 7360 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OG Status: CM - 7/12/2013 Interval Top: 7118 ft. Interval Bottom: 7838 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/1/1999 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7230'. 10-28-08. DRILLED OUT CBP @ 7500' TO COMMINGLE THE JSND-NBRR-CDL. 10-29-08 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7762 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/19/2013 | Test Method: | Flow | | Hours Tested: | 8 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 836 | | BBLS_OIL | 12 | | BTU_GAS | 1272 | | CALC_BBLS_H2O | 240 | | CALC_BBLS_OIL | 36 | | CALC_GOR | 5000 | | CALC_MCF_GAS | 180 | | CASING_PRESS | 435 | | GRAVITY_OIL | 58 | | MCF_GAS | 60 | | TUBING_PRESS | 258 |
| | Perforation Data: | | Interval Top: | 7118 ft. | # Of Holes: | 364 | | Interval Bottom: | 7838 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/10/2018 Interval Top: 7118 ft. Interval Bottom: 7360 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/29/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/15/2008 | | Treatment Summary: | NBRR-CDL RECOMPLETION SET CBP@7500'.10-14-08.RE-FRAC'D THE CODELL WITH 122,010 GAL 24#VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,200#SAND.10-15-08 SET CFP@7230'. 10-15-08. --SEE OPERATORS COMMENTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7118 ft. | # Of Holes: | 120 | | Interval Bottom: | 7360 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/10/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|