Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19727
Well Classification: GW Status: PA - 4/10/2018
Well Name/No:KIYOTA #34-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/10/2018
FacilityID:251922LocationID:336272
County:WELD #123Location:SWSE 35 3N67W 6
Field:WATTENBERG - #90750Elevation:4834 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:656FSL  1960 FELLat/Long: 40.176137 / -104.855492Lat/Long Source: Calculated From Footages
As Drilled Location:657 FSL  1994 FELLat/Long: 40.176150 / -104.855480Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/3/2013
End Date: 6/3/2013
Reported: 8/1/2013
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/25/2018             Measured TD: 7922 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/25/2018
Wellbore Permit
Permit #:Expiration Date:11/18/2000
Proposed Depth/Form:7940 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-466 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:2/1/1999
Spud Date:1/8/1999Spud Date Is:ACTUAL
Measured TD:7922 ft.Measured PB depth:7886 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 399 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 399 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7922 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 6406 ft., Bottom: 7922 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4215 ft.
SHANNON4791 ft.
NIOBRARA7079 ft.
FORT HAYS7316 ft.
CODELL7340 ft.
CARLILE7362 ft.
GREENHORN7390 ft.
BENTONITE7610 ft.
GRANEROS7611 ft.
MOWRY7764 ft.
J SAND7778 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 4/10/2018                 Interval Top: 7783 ft.    Interval Bottom: 7838 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/1/1999
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7783 ft.# Of Holes:82
Interval Bottom:7838 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 9/1/1999                  Interval Top: 7340 ft.    Interval Bottom: 7838 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/1/1999
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7773 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 12
CALC_BBLS_H2O 8
CALC_BBLS_OIL 12
CALC_GOR 47500
CALC_MCF_GAS 570
CASING_PRESS 310
MCF_GAS 570
TUBING_PRESS 540
Perforation Data:
Interval Top:7340 ft.# Of Holes:122
Interval Bottom:7838 ft.Hole Size:

Formation CODL                     Formation Classification:  OG                     Status:  CM - 7/12/2013                 Interval Top: 7118 ft.    Interval Bottom: 7360 ft.

 Completed Information for Formation CODELL
1st Production Date:9/1/1999Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/3/2013Treatment End Date:6/3/2013
Treatment Summary:Set CIBP @ 7480'. Frac Codell with 250,720# sand and 78,939 gal (1879.5 bbls) frac fluid. Drill up CIBP.
Total fluid used in treatment (bbls):1880Max pressure during treatment (psi):5095
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1286
Fresh water used in treatment (bbls):1880Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250720Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/1/1999
Treatment Summary:FRAC WELL WITH 10,000# 100 MESH, 1/2 PPG,1PPG, 300,000# 20/40 SAND 1PPG THRU 4PPGIN 176736 GAL SATURN 1 30.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 35
CALC_BBLS_H2O 4
CALC_BBLS_OIL 35
CALC_GOR 4029
CALC_MCF_GAS 141
CASING_PRESS 550
MCF_GAS 141
TUBING_PRESS 250
Perforation Data:
Interval Top:7118 ft.# Of Holes:120
Interval Bottom:7360 ft.Hole Size:

Formation JNBCD                   Formation Classification:  OG                   Status:  CM - 7/12/2013                 Interval Top: 7118 ft.    Interval Bottom: 7838 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/1/1999
Treatment Summary:JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7230'. 10-28-08. DRILLED OUT CBP @ 7500' TO COMMINGLE THE JSND-NBRR-CDL. 10-29-08
Tubing Size:2.375 in.Tubing Setting Depth:7762 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/19/2013Test Method:Flow
Hours Tested:8Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 836
BBLS_OIL 12
BTU_GAS 1272
CALC_BBLS_H2O 240
CALC_BBLS_OIL 36
CALC_GOR 5000
CALC_MCF_GAS 180
CASING_PRESS 435
GRAVITY_OIL 58
MCF_GAS 60
TUBING_PRESS 258
Perforation Data:
Interval Top:7118 ft.# Of Holes:364
Interval Bottom:7838 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/10/2018                 Interval Top: 7118 ft.    Interval Bottom: 7360 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/29/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/15/2008
Treatment Summary:NBRR-CDL RECOMPLETION SET CBP@7500'.10-14-08.RE-FRAC'D THE CODELL WITH 122,010 GAL 24#VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,200#SAND.10-15-08 SET CFP@7230'. 10-15-08. --SEE OPERATORS COMMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7118 ft.# Of Holes:120
Interval Bottom:7360 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/10/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No