|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/6/2017 Measured TD: 8033 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/6/2017 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 3/21/2011 | | Proposed Depth/Form: | 8033 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E/2NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 682 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 682 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8014 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 265, Top: 4016 ft., Bottom: 5046 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8014 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 6525 ft., Bottom: 8033 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/10/1998 | | Spud Date: | 7/17/1998 | Spud Date Is: | ACTUAL | | Measured TD: | 8033 ft. | Measured PB depth: | 7987 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | CDCNGR, DIGLGR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 682 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 682 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8014 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 6528 ft., Bottom: 8014 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8014 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6525 ft., Bottom: 8033 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5043 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 4020 ft., Bottom: 5060 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4308 ft. | | | | | SHANNON | 4809 ft. | | | | | NIOBRARA | 7146 ft. | | | | | FORT HAYS | 7388 ft. | | | | | CODELL | 7409 ft. | | | | | J SAND | 7844 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 4/6/2017 Interval Top: 7846 ft. Interval Bottom: 7895 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/18/1998 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/3/2011 | | Treatment Summary: | REMOVED SAND PLUG SET @ 7600-7800 TO COMMINGLE JSND WITH NB/CD. HOLE SIZE N/A | | Formation Treatment | | Treatment Date: | 7/9/2010 | | Treatment Summary: | SET SAND PLUG @ 7600'. | | Formation Treatment | | Treatment Date: | 8/10/1998 | | Treatment Summary: | FRAC'D J SAND W/561,080# 20/40 JORDAN; 236,208 GALS SATURN 1 30,25,20,17 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 8 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 98375 | | CALC_MCF_GAS | 787 | | CASING_PRESS | 800 | | GRAVITY_OIL | 60 | | MCF_GAS | 787 | | TUBING_PRESS | 700 |
| | Perforation Data: | | Interval Top: | 7846 ft. | # Of Holes: | 63 | | Interval Bottom: | 7895 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/15/2011 Interval Top: 7152 ft. Interval Bottom: 7895 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 10/5/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/3/2011 | | Treatment Summary: | REMOVED SAND PLUG SET @ 7600-7800 TO COMMINGLE JSND WITH NB/CD |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/15/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 34 | | BTU_GAS | 1260 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 8647 | | CALC_MCF_GAS | 294 | | CASING_PRESS | 553 | | GRAVITY_OIL | 49 | | MCF_GAS | 294 |
| | Perforation Data: | | Interval Top: | 7152 ft. | # Of Holes: | 187 | | Interval Bottom: | 7895 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/6/2017 Interval Top: 7152 ft. Interval Bottom: 7428 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/28/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/16/2010 | | Treatment Summary: | NBRR PERF 7152-7278 HOLES 64 SIZE 0.42 CODL PERF 7408-7428 HOLES 60 SIZE 0.38 FRAC NBRR W/250 GAL 15% HCL & 250,096 GAL SW & 200,920# 40/70 SAND & 4,000# SB EXCEL. FRAC CODL W/207,352 GAL SW & 150,960# 40/70 SAND & 4,000# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/5/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1270 | | CALC_BBLS_OIL | 74 | | CALC_GOR | 2676 | | CALC_MCF_GAS | 198 | | CASING_PRESS | 1700 | | GRAVITY_OIL | 46 |
| | Perforation Data: | | Interval Top: | 7152 ft. | # Of Holes: | 124 | | Interval Bottom: | 7428 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/06/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|