|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2022 Measured TD: 8220 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2022 | | Wellbore Permit | | | Permit #: | 19980565 | Expiration Date: | 6/19/2002 | | Proposed Depth/Form: | 8220 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: W2SE4 |
| | |
| Wellbore Completed | | Completion Date: | 7/31/1998 | | Spud Date: | 6/24/1998 | Spud Date Is: | ACTUAL | | Measured TD: | 8220 ft. | Measured PB depth: | 8168 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIGLGR, CDCNGR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 997 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 997 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8197 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 4540 ft., Bottom: 5140 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8197 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 7000 ft., Bottom: 8220 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4736 ft. | | | | | NIOBRARA | 7350 ft. | | | | | FORT HAYS | 7590 ft. | | | | | CODELL | 7614 ft. | | | | | J SAND | 8042 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 5/1/2022 Interval Top: 8044 ft. Interval Bottom: 8084 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/18/1998 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/9/2012 | | Treatment Summary: | REMOVE SAND PLUG @ 7820-7822 TO COMMINGLE JSND WITH NB/CD. | | Formation Treatment | | Treatment Date: | 5/24/2010 | | Treatment Summary: | SET SAND PLUG @ 7820. | | Formation Treatment | | Treatment Date: | 7/31/1998 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00094917 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 48 | | CALC_BBLS_OIL | 14 | | CALC_GOR | 48000 | | CALC_MCF_GAS | 658 | | MCF_GAS | 96 |
| | Perforation Data: | | Interval Top: | 8044 ft. | # Of Holes: | 40 | | Interval Bottom: | 8084 ft. | Hole Size: | 0.35 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/24/2010 Interval Top: 7614 ft. Interval Bottom: 7630 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/9/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2010 | | Treatment Summary: | REPERF CODL 7614-7630 HOLES 64 SIZE 0.38. REFRAC CODL W/ 201989 GAL SW AND 150080# 40/70 SAND AND 4000# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7614 ft. | # Of Holes: | 74 | | Interval Bottom: | 7630 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/1/2012 Interval Top: 7422 ft. Interval Bottom: 8084 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 12/31/2001 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/9/2012 | | Treatment Summary: | REMOVE SAND PLUG @ 7820-7822 TO COMMINGLE JSND WITH NB/CD. RETURNED DOWNLINE ON 1/19/2012. | | Formation Treatment | | Treatment Date: | 7/31/1998 | | Treatment Summary: | FRAC'D NB-CD W/365700# 20/40 MESH; 118694 GAL. GELLED FLUID COMMINGLED W/J SAND NBRR PERFS; 7422'-7436' CODL ERFS; 7616'-7626' |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8016 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/30/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 2 | | BTU_GAS | 1294 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 38000 | | CALC_MCF_GAS | 76 | | CASING_PRESS | 365 | | GRAVITY_OIL | 53 | | MCF_GAS | 76 | | TUBING_PRESS | 367 |
| | Perforation Data: | | Interval Top: | 7422 ft. | # Of Holes: | 179 | | Interval Bottom: | 8084 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2022 Interval Top: 7422 ft. Interval Bottom: 7630 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/9/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2010 | | Treatment Summary: | NBRR PERF 7422-7529 HOLES 65 SIZE 0.47. CODL PERF 7614-7630 HOLES 64 SIZE 0.38. | | Formation Treatment | | Treatment Date: | 7/31/1998 | | Treatment Summary: | SEE SCANNED DOCUMENT # 01085687 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/16/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 13 | | BTU_GAS | 1276 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 5700 | | CALC_MCF_GAS | 285 | | CASING_PRESS | 450 | | GRAVITY_OIL | 50 | | MCF_GAS | 153 | | TUBING_PRESS | 550 |
| | Perforation Data: | | Interval Top: | 7422 ft. | # Of Holes: | 139 | | Interval Bottom: | 7630 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/24/2010 Interval Top: 7422 ft. Interval Bottom: 7529 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/9/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2010 | | Treatment Summary: | REPERF NBRR 7424-7529 HOLES 60 SIZE 0.47. REFRAC NBRR W/ 500 GAL 15% HCL AND 248189 GAL SW AND 200320# 40/70 SAND AND 4000# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7422 ft. | # Of Holes: | 65 | | Interval Bottom: | 7529 ft. | Hole Size: | 0.47 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 04/30/2022 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|