Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19601
Well Classification: GW Status: PA - 7/12/2018
Well Name/No:BOULDER BANK #34-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/12/2018
FacilityID:251797LocationID:330775
County:WELD #123Location:SWSE 7 1N66W 6
Field:WATTENBERG - #90750Elevation:4939 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:860FSL  1980 FELLat/Long: 40.060688 / -104.817630Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.060778 / -104.817535Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 7/12/2018             Measured TD: 8060 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 7/12/2018
Wellbore Permit
Permit #:Expiration Date:1/23/2002
Proposed Depth/Form:8060 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:3/21/1999
Spud Date:2/25/1999Spud Date Is:ACTUAL
Measured TD:8060 ft.Measured PB depth:8030 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 900 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 525, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8059 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6683 ft., Bottom: 8059 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8059 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4887 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 4337 ft., Bottom: 4887 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4495 ft.
NIOBRARA7123 ft.
FORT HAYS7438 ft.
CODELL7462 ft.
CARLILE7482 ft.
GREENHORN7520 ft.
BENTONITE7740 ft.
GRANEROS7741 ft.
MOWRY7887 ft.
J SAND7903 ft.
SKULL CREEK8008 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 7/12/2018                 Interval Top: 7912 ft.    Interval Bottom: 7946 ft.

 Completed Information for Formation J SAND
1st Production Date:11/11/2002Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/21/1999
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7912 ft.# Of Holes:52
Interval Bottom:7946 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  AB - 7/12/2018                 Interval Top: 7463 ft.    Interval Bottom: 7480 ft.

 Completed Information for Formation CODELL
1st Production Date:1/11/2002Choke Size:0.313 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/21/1999
Treatment Summary:FRAC W/300,720# 20/40 FRAC SAND IN 133,293 GALS PHOENIX 22# & 20#. FLOW BACK FRAC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/9/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 30
CALC_BBLS_H2O 21
CALC_BBLS_OIL 30
CALC_GOR 3034
CALC_MCF_GAS 91
CASING_PRESS 180
MCF_GAS 91
Perforation Data:
Interval Top:7463 ft.# Of Holes:34
Interval Bottom:7480 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 8/27/2002                 Interval Top: 7463 ft.    Interval Bottom: 7918 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/21/1999
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7907 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 17
CALC_BBLS_OIL 17
CALC_GOR 26824
CALC_MCF_GAS 456
MCF_GAS 456
Perforation Data:
Interval Top:7463 ft.# Of Holes:86
Interval Bottom:7918 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/12/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No