|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 2/7/2024 Measured TD: 7935 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 2/7/2024 | Wellbore Permit | | Permit #: | 19980282 | Expiration Date: | 1/18/2001 | Proposed Depth/Form: | 8000 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 6/3/2000 | Spud Date: | 2/20/1999 | Spud Date Is: | ACTUAL | Measured TD: | 7935 ft. | Measured PB depth: | 7899 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CD,CN/GR,DIGL/GR,GR,CBL,CCL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 414 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 290, Top: 0 ft., Bottom: 414 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7923 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 6826 ft., Bottom: 7935 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4985 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 3740 ft., Bottom: 4985 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4251 ft. | | N | N | SHANNON | 4772 ft. | | N | N | NIOBRARA | 7137 ft. | | N | N | FORT HAYS | 7375 ft. | | N | N | CODELL | 7396 ft. | | N | N | CARLILE | 7420 ft. | | N | N | GREENHORN | 7433 ft. | | N | N | BENTONITE | 7658 ft. | | N | N | GRANEROS | 7659 ft. | | N | N | MOWRY | 7809 ft. | | N | N | J-2 SAND | 7825 ft. | | N | N | J-3 SAND | 7842 ft. | | N | N | SKULL CREEK | 7929 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 2/7/2024 Interval Top: 7828 ft. Interval Bottom: 7870 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/14/1999 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/3/2000 | Treatment Summary: | 175,770 GALS SATURN I 30 GEL W/ 550,140# 20/40 FRAC SAND 1 PPG THRU 5 PPG |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 25 | BBLS_OIL | 4 | CALC_BBLS_H2O | 25 | CALC_BBLS_OIL | 4 | CALC_GOR | 109750 | CALC_MCF_GAS | 439 | CASING_PRESS | 335 | MCF_GAS | 439 |
| Perforation Data: | Interval Top: | 7828 ft. | # Of Holes: | 54 | Interval Bottom: | 7870 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/15/2023 Interval Top: 7398 ft. Interval Bottom: 7418 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/28/2000 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/3/2000 | Treatment Summary: | 138,012 GALS VISTAR 22 LHT, 20 LHT W/ 18,800# 100 MESH 400,160# 20/40 FRAC SAND 1/2 PG THRU 5 PPG. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 18 | BBLS_OIL | 62 | CALC_BBLS_H2O | 18 | CALC_BBLS_OIL | 62 | CALC_GOR | 3952 | CALC_MCF_GAS | 245 | CASING_PRESS | 250 | MCF_GAS | 245 |
| Perforation Data: | Interval Top: | 7398 ft. | # Of Holes: | 40 | Interval Bottom: | 7418 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 9/13/2000 Interval Top: 7398 ft. Interval Bottom: 7870 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 6/3/2000 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/3/2000 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7918 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/3/2000 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 14 | BBLS_OIL | 36 | CALC_BBLS_H2O | 14 | CALC_BBLS_OIL | 36 | CALC_GOR | 18528 | CALC_MCF_GAS | 667 | CASING_PRESS | 440 | MCF_GAS | 667 | TUBING_PRESS | 215 |
| Perforation Data: | Interval Top: | 7398 ft. | # Of Holes: | 94 | Interval Bottom: | 7870 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/27/2008 Interval Top: 7188 ft. Interval Bottom: 7870 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/3/2000 | Treatment Summary: | DRILLED UP CFP @ 7310' & CBP @ 7490' TO COMMINGLE THE JSND-NBRR-CODL. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7800 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/27/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 15 | BBLS_OIL | 16 | BTU_GAS | 1240 | CALC_BBLS_H2O | 15 | CALC_BBLS_OIL | 16 | CALC_GOR | 1125 | CALC_MCF_GAS | 180 | CASING_PRESS | 936 | GRAVITY_OIL | 49 | MCF_GAS | 180 | TUBING_PRESS | 498 |
| Perforation Data: | Interval Top: | 7188 ft. | # Of Holes: | 162 | Interval Bottom: | 7870 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/7/2024 Interval Top: 7188 ft. Interval Bottom: 7418 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/20/2008 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/20/2008 | Treatment Summary: | NB-CD REFRAC & RECOMPLTN. SET CBP @7490'. REFRACD CODL W/113,694 GAL FRAC FLUID & 254,180# WHITE 20/40 SAND. SET CFP @7310. FRACD NBRR W/173,178 GAL FRAC FLUID & 253,720# 20/40 SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7188 ft. | # Of Holes: | 108 | Interval Bottom: | 7418 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 5/25/2023 Interval Top: 7188 ft. Interval Bottom: 7202 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/20/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7188 ft. | # Of Holes: | 68 | Interval Bottom: | 7202 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 02/07/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|