Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19581
Well Classification: OW Status: PA - 2/7/2024
Well Name/No:WANDELL #32-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/7/2024
FacilityID:251777LocationID:336456
Municipality/County:FIRESTONE / WELD #123Location:SWNE 7 2N67W 6
Field:WATTENBERG - #90750Elevation:4892 ft.
Planned Location:1995FNL  1885 FELLat/Long: 40.154896 / -104.930875Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.154953 / -104.930607Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/1/2013
End Date: 8/1/2013
Reported: 10/1/2013
Days to report: 61
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 2/7/2024             Measured TD: 7935 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 2/7/2024
Wellbore Permit
Permit #:19980282 Expiration Date:1/18/2001
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit:

Wellbore Completed
Completion Date:6/3/2000
Spud Date:2/20/1999Spud Date Is:ACTUAL
Measured TD:7935 ft.Measured PB depth:7899 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CD,CN/GR,DIGL/GR,GR,CBL,CCL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 414 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 414 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7923 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6826 ft., Bottom: 7935 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4985 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 3740 ft., Bottom: 4985 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4251 ft.NN
SHANNON4772 ft.NN
NIOBRARA7137 ft.NN
FORT HAYS7375 ft.NN
CODELL7396 ft.NN
CARLILE7420 ft.NN
GREENHORN7433 ft.NN
BENTONITE7658 ft.NN
GRANEROS7659 ft.NN
MOWRY7809 ft.NN
J-2 SAND7825 ft.NN
J-3 SAND7842 ft.NN
SKULL CREEK7929 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 2/7/2024                  Interval Top: 7828 ft.    Interval Bottom: 7870 ft.

 Completed Information for Formation J SAND
1st Production Date:4/14/1999Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/3/2000
Treatment Summary:175,770 GALS SATURN I 30 GEL W/ 550,140# 20/40 FRAC SAND 1 PPG THRU 5 PPG
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 4
CALC_BBLS_H2O 25
CALC_BBLS_OIL 4
CALC_GOR 109750
CALC_MCF_GAS 439
CASING_PRESS 335
MCF_GAS 439
Perforation Data:
Interval Top:7828 ft.# Of Holes:54
Interval Bottom:7870 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/15/2023                 Interval Top: 7398 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation CODELL
1st Production Date:2/28/2000Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/3/2000
Treatment Summary:138,012 GALS VISTAR 22 LHT, 20 LHT W/ 18,800# 100 MESH 400,160# 20/40 FRAC SAND 1/2 PG THRU 5 PPG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 62
CALC_BBLS_H2O 18
CALC_BBLS_OIL 62
CALC_GOR 3952
CALC_MCF_GAS 245
CASING_PRESS 250
MCF_GAS 245
Perforation Data:
Interval Top:7398 ft.# Of Holes:40
Interval Bottom:7418 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 9/13/2000                 Interval Top: 7398 ft.    Interval Bottom: 7870 ft.

 Completed Information for Formation J-CODELL
1st Production Date:6/3/2000Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:6/3/2000
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7918 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/3/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 36
CALC_BBLS_H2O 14
CALC_BBLS_OIL 36
CALC_GOR 18528
CALC_MCF_GAS 667
CASING_PRESS 440
MCF_GAS 667
TUBING_PRESS 215
Perforation Data:
Interval Top:7398 ft.# Of Holes:94
Interval Bottom:7870 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 4/27/2008                 Interval Top: 7188 ft.    Interval Bottom: 7870 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/3/2000
Treatment Summary:DRILLED UP CFP @ 7310' & CBP @ 7490' TO COMMINGLE THE JSND-NBRR-CODL.
Tubing Size:2.375 in.Tubing Setting Depth:7800 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2008Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 16
BTU_GAS 1240
CALC_BBLS_H2O 15
CALC_BBLS_OIL 16
CALC_GOR 1125
CALC_MCF_GAS 180
CASING_PRESS 936
GRAVITY_OIL 49
MCF_GAS 180
TUBING_PRESS 498
Perforation Data:
Interval Top:7188 ft.# Of Holes:162
Interval Bottom:7870 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/7/2024                  Interval Top: 7188 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/20/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/20/2008
Treatment Summary:NB-CD REFRAC & RECOMPLTN. SET CBP @7490'. REFRACD CODL W/113,694 GAL FRAC FLUID & 254,180# WHITE 20/40 SAND. SET CFP @7310. FRACD NBRR W/173,178 GAL FRAC FLUID & 253,720# 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7188 ft.# Of Holes:108
Interval Bottom:7418 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/25/2023                 Interval Top: 7188 ft.    Interval Bottom: 7202 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/20/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7188 ft.# Of Holes:68
Interval Bottom:7202 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/07/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No