Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19581
Well Classification: OW Status: PA - 2/7/2024
Well Name/No:WANDELL #32-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/7/2024
FacilityID:251777LocationID:336456
Municipality/County:FIRESTONE / WELD #123Location:SWNE 7 2N67W 6
Field:WATTENBERG - #90750Elevation:4892 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1995FNL  1885 FELLat/Long: 40.154896 / -104.930875Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.154953 / -104.930607Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/1/2013
End Date: 8/1/2013
Reported: 10/1/2013
Days to report: 61
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 2/7/2024             Measured TD: 7935 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 2/7/2024
Wellbore Permit
Permit #:19980282 Expiration Date:1/18/2001
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit:

Wellbore Completed
Completion Date:6/3/2000
Spud Date:2/20/1999Spud Date Is:ACTUAL
Measured TD:7935 ft.Measured PB depth:7899 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CD,CN/GR,DIGL/GR,GR,CBL,CCL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 414 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 414 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7923 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6826 ft., Bottom: 7935 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4985 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 3740 ft., Bottom: 4985 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4251 ft.NN
SHANNON4772 ft.NN
NIOBRARA7137 ft.NN
FORT HAYS7375 ft.NN
CODELL7396 ft.NN
CARLILE7420 ft.NN
GREENHORN7433 ft.NN
BENTONITE7658 ft.NN
GRANEROS7659 ft.NN
MOWRY7809 ft.NN
J-2 SAND7825 ft.NN
J-3 SAND7842 ft.NN
SKULL CREEK7929 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 2/7/2024                  Interval Top: 7828 ft.    Interval Bottom: 7870 ft.

 Completed Information for Formation J SAND
1st Production Date:4/14/1999Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/3/2000
Treatment Summary:175,770 GALS SATURN I 30 GEL W/ 550,140# 20/40 FRAC SAND 1 PPG THRU 5 PPG
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 4
CALC_BBLS_H2O 25
CALC_BBLS_OIL 4
CALC_GOR 109750
CALC_MCF_GAS 439
CASING_PRESS 335
MCF_GAS 439
Perforation Data:
Interval Top:7828 ft.# Of Holes:54
Interval Bottom:7870 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/15/2023                 Interval Top: 7398 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation CODELL
1st Production Date:2/28/2000Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/3/2000
Treatment Summary:138,012 GALS VISTAR 22 LHT, 20 LHT W/ 18,800# 100 MESH 400,160# 20/40 FRAC SAND 1/2 PG THRU 5 PPG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 62
CALC_BBLS_H2O 18
CALC_BBLS_OIL 62
CALC_GOR 3952
CALC_MCF_GAS 245
CASING_PRESS 250
MCF_GAS 245
Perforation Data:
Interval Top:7398 ft.# Of Holes:40
Interval Bottom:7418 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 9/13/2000                 Interval Top: 7398 ft.    Interval Bottom: 7870 ft.

 Completed Information for Formation J-CODELL
1st Production Date:6/3/2000Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:6/3/2000
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7918 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/3/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 36
CALC_BBLS_H2O 14
CALC_BBLS_OIL 36
CALC_GOR 18528
CALC_MCF_GAS 667
CASING_PRESS 440
MCF_GAS 667
TUBING_PRESS 215
Perforation Data:
Interval Top:7398 ft.# Of Holes:94
Interval Bottom:7870 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 4/27/2008                 Interval Top: 7188 ft.    Interval Bottom: 7870 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/3/2000
Treatment Summary:DRILLED UP CFP @ 7310' & CBP @ 7490' TO COMMINGLE THE JSND-NBRR-CODL.
Tubing Size:2.375 in.Tubing Setting Depth:7800 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2008Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 16
BTU_GAS 1240
CALC_BBLS_H2O 15
CALC_BBLS_OIL 16
CALC_GOR 1125
CALC_MCF_GAS 180
CASING_PRESS 936
GRAVITY_OIL 49
MCF_GAS 180
TUBING_PRESS 498
Perforation Data:
Interval Top:7188 ft.# Of Holes:162
Interval Bottom:7870 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/7/2024                  Interval Top: 7188 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/20/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/20/2008
Treatment Summary:NB-CD REFRAC & RECOMPLTN. SET CBP @7490'. REFRACD CODL W/113,694 GAL FRAC FLUID & 254,180# WHITE 20/40 SAND. SET CFP @7310. FRACD NBRR W/173,178 GAL FRAC FLUID & 253,720# 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7188 ft.# Of Holes:108
Interval Bottom:7418 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/25/2023                 Interval Top: 7188 ft.    Interval Bottom: 7202 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/20/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7188 ft.# Of Holes:68
Interval Bottom:7202 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/07/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No