|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 2/1/2022 Measured TD: 8030 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 2/1/2022 | Wellbore Permit | | Permit #: | 19980165 | Expiration Date: | 11/29/2000 | Proposed Depth/Form: | 8030 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-466 , Unit Acreage: 160, Drill Unit: SW4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 316, Drill Unit: S2 |
| | |
Wellbore Completed | Completion Date: | 4/29/1998 | Spud Date: | 3/25/1998 | Spud Date Is: | ACTUAL | Measured TD: | 8030 ft. | Measured PB depth: | 7999 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | DUAL INDUCATION GUARD LOG GR; COMPENSATED DENSITY AND NETURON GR; GR CEMENT BOND VDL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 415 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 0 ft., Bottom: 415 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8021 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 485, Top: 6540 ft., Bottom: 8021 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4318 ft. | | | | SHANNON | 4845 ft. | | | | NIOBRARA | 7152 ft. | | | | CODELL | 7427 ft. | | | | GREENHORN | 7470 ft. | | | | GRANEROS | 7689 ft. | | | | MOWRY | 7840 ft. | | | | J SAND | 7855 ft. | | | | SKULL CREEK | 7962 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 2/1/2022 Interval Top: 7865 ft. Interval Bottom: 7891 ft. Completed Information for Formation J SAND | 1st Production Date: | 5/2/1998 | Choke Size: | 0.468 in. | Formation Name: | J SAND | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/29/1998 | Treatment Summary: | FRAC'D WITH 450400# 20/40 SAND AND 187496 GALS 35# & 33# FRACGEL |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7848 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/31/1998 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 29 | BBLS_OIL | 2 | BTU_GAS | 1156 | CALC_BBLS_H2O | 29 | CALC_BBLS_OIL | 2 | CALC_GOR | 241500 | CALC_MCF_GAS | 483 | CASING_PRESS | 320 | MCF_GAS | 483 | TUBING_PRESS | 130 |
| Perforation Data: | Interval Top: | 7865 ft. | # Of Holes: | 21 | Interval Bottom: | 7891 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 4/21/2000 Interval Top: 7427 ft. Interval Bottom: 7448 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/28/2000 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/29/1998 | Treatment Summary: | FRAC W/11080# 100 MESH 1/2 PPG, 1 PPG, 301080# 20/40 FRAC SAND 1 PPG THRU 4 PPG IN 128000 GAL PHOENIX 27# HT, & 27# FRAC FLUID. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/28/2000 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 39 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 39 | CALC_GOR | 2538 | CALC_MCF_GAS | 99 | CASING_PRESS | 220 | MCF_GAS | 99 |
| Perforation Data: | Interval Top: | 7427 ft. | # Of Holes: | 42 | Interval Bottom: | 7448 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/4/2007 Interval Top: 7212 ft. Interval Bottom: 7891 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/3/2007 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7310'. 5/22/07. DRILLED OUT CFP @7600' TO COMMINGLE THE JSND-NBRR-CDL. 5/23/07. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7853 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/4/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 27 | BBLS_OIL | 13 | BTU_GAS | 1206 | CALC_BBLS_H2O | 27 | CALC_BBLS_OIL | 13 | CALC_GOR | 4308 | CALC_MCF_GAS | 56 | CASING_PRESS | 1174 | GRAVITY_OIL | 50 | MCF_GAS | 56 | TUBING_PRESS | 587 |
| Perforation Data: | Interval Top: | 7212 ft. | # Of Holes: | 103 | Interval Bottom: | 7891 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 2/1/2022 Interval Top: 7212 ft. Interval Bottom: 7448 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/12/2007 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/3/2007 | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP @ 7600' 05/02/07 FRAC'D THE CODL WITH 132,050 GAL FRAC FLUID & 246,540# 20/40 SAND. SET CFP @ 7310' 05/03/07 FRAC'D THE NBRR WITH 181,734 GAL FRAC FLUID & 250,560# 20/40 SAND 05/03/07 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/14/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 55 | BBLS_OIL | 60 | CALC_BBLS_H2O | 55 | CALC_BBLS_OIL | 60 | CALC_GOR | 3333 | CALC_MCF_GAS | 200 | CASING_PRESS | 138 | MCF_GAS | 200 |
| Perforation Data: | Interval Top: | 7212 ft. | # Of Holes: | 82 | Interval Bottom: | 7448 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 01/31/2022 |
Low Producing | Y | Production Period 03/2024 - 02/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|