|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/17/2023 Measured TD: 8001 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/17/2023 | | Wellbore Permit | | | Permit #: | 20032170 | Expiration Date: | 12/3/2004 | | Proposed Depth/Form: | 7987 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: W/2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 7/22/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 8001 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL,MICRO LOG, ARRAY INDUCTION, COMPENSATED NEUTRON | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.2 in., Size: 8.625 in., Top: 0 ft., Depth: 588 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 588 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7987 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6480 ft., Bottom: 7987 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4250 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 828, Top: 0 ft., Bottom: 4250 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 4250 ft., Bottom: 4250 ft., Sacks: 828, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4119 ft. | | N | N | | NIOBRARA | 7016 ft. | | N | N | | FORT HAYS | 7242 ft. | | N | N | | CODELL | 7263 ft. | | N | N | | GREENHORN | 7305 ft. | | N | N | | MOWRY | 7687 ft. | | N | N | | J-2 SAND | 7704 ft. | | N | N | | SKULL CREEK | 7808 ft. | | N | N |
Formation DKTA Formation Classification: OG Status: AB - 1/17/2023 Interval Top: 7908 ft. Interval Bottom: 7922 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/3/2003 | | Treatment Summary: | FRAC'D W/31,084 GAL DYNAFLOW-2 CROSSLINKED 30# GELLED WATER CONTAINING 5,500# 100 MESH SAND, 40,240# 20/40 SAND, 10,100# 20/40 ACFRAC PR-6000 RESIN-COATED SAND 8/11/03 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BBLS_OIL | 7 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 37571 | | CALC_MCF_GAS | 263 | | CASING_PRESS | 350 | | MCF_GAS | 263 | | TUBING_PRESS | 160 |
| | Perforation Data: | | Interval Top: | 7908 ft. | # Of Holes: | 44 | | Interval Bottom: | 7922 ft. | Hole Size: | |
|
Formation DK-J Formation Classification: GW Status: CM - 11/4/2003 Interval Top: 7706 ft. Interval Bottom: 7922 ft.| Completed Information for Formation DAKOTA-JSND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA-JSND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/3/2003 | | Treatment Summary: | RIH W/TBG. DRILL CIBP. POOH. LD JTS, TBG. LAND EOT @7700'. KILL WELL. POOH. RIH W/PROD TBG. LAND EOT @ 7696'. SWAB. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7696 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/4/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 37 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 37 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 50200 | | CALC_MCF_GAS | 251 | | CASING_PRESS | 750 | | MCF_GAS | 251 | | TUBING_PRESS | 340 |
| | Perforation Data: | | Interval Top: | 7706 ft. | # Of Holes: | 204 | | Interval Bottom: | 7922 ft. | Hole Size: | |
|
Formation JSND Formation Classification: OG Status: AB - 1/17/2023 Interval Top: 7706 ft. Interval Bottom: 7762 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/3/2003 | | Treatment Summary: | FRAC'D W/193,426 GAL SLICK WATER AND 162,020# 20/40 SAND. 09-27-03 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 15 | | CASING_PRESS | 996 | | MCF_GAS | 15 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7706 ft. | # Of Holes: | 160 | | Interval Bottom: | 7762 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 8/30/2011 Interval Top: 7262 ft. Interval Bottom: 7288 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/3/2003 | | Treatment Summary: | FRAC'D W/131,900 GAL FRAC FLUID AND 301,420# SAND. 03-07-04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7262 ft. | # Of Holes: | 52 | | Interval Bottom: | 7288 ft. | Hole Size: | |
|
Formation DKJNC Formation Classification: OG Status: CM - 8/30/2011 Interval Top: 7020 ft. Interval Bottom: 7922 ft.| Completed Information for Formation DAKOTA-J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA-J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/15/2011 | | Treatment Summary: | CBP SET @ 7210' ON 3/8/2011; CIBP SET @ 7350' ON 3/8/2011. PLUGS WERE DRILLED OUT 5/11/11 AND 2-3/8" TBG SET AT 7685'. COMMINGLED ON 5/13/2011 | | Formation Treatment | | Treatment Date: | 8/3/2003 | | Treatment Summary: | DAKOTA-J SAND-NIOBRARA-CODELL COMMINGLE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7685 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/15/2011 | Test Method: | FLOW TEST | | Hours Tested: | 20 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 25 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 9440 | | CALC_MCF_GAS | 283 | | CASING_PRESS | 743 | | GRAVITY_OIL | 53 | | MCF_GAS | 236 | | TUBING_PRESS | 359 |
| | Perforation Data: | | Interval Top: | 7020 ft. | # Of Holes: | 376 | | Interval Bottom: | 7922 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OG Status: AB - 1/17/2023 Interval Top: 7020 ft. Interval Bottom: 7288 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/8/2011 | | Treatment Summary: | PROVIDE A BRIEF SUMMARY OF THE FORMATION TREATMENT:
FRAC'D THE NBRR WITH 135828 GAL FRAC FLUID AND 250160# SAND.
FRAC'D THE CD THE 119574 GAL FRAC FLUID AND 250520# SAND.
CBP SET @ 7210' ON 3/8/2011; CIBP SET @ 7350' 3/8/2011. PLUGS WERE DRILLED OUT 5/11/11. | | Formation Treatment | | Treatment Date: | 8/3/2003 | | Treatment Summary: | NIOBRARA-CODELL RECOMPLETION SET CIBP@7338'. 03-07-04 FRAC'D W/131,900 GAL FRAC FLUID AND 301,420# SAND. 03-07-04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 25 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 393 | | CALC_MCF_GAS | 283 | | CASING_PRESS | 743 | | GRAVITY_OIL | 53 | | MCF_GAS | 236 | | TUBING_PRESS | 359 |
| | Perforation Data: | | Interval Top: | 7020 ft. | # Of Holes: | 172 | | Interval Bottom: | 7288 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 3/15/2004 Interval Top: 7020 ft. Interval Bottom: 7180 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/3/2003 | | Treatment Summary: | SET CBP@7240'. 03-10-04 FRAC'D THE NIOBRARA W/139,000 GAL FRAC FLUID AND 200,060# SAND. 03-11-04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/15/2004 | Test Method: | FLOWING | | Hours Tested: | 22 | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 67 | | BBLS_OIL | 105 | | CALC_BBLS_H2O | 76 | | CALC_BBLS_OIL | 105 | | CALC_GOR | 4143 | | CALC_MCF_GAS | 435 | | CASING_PRESS | 640 | | MCF_GAS | 435 |
| | Perforation Data: | | Interval Top: | 7020 ft. | # Of Holes: | 120 | | Interval Bottom: | 7180 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/17/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|