Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19383
Well Classification: OW Status: PA - 2/19/2025
Well Name/No:GAMEWELL #34-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/19/2025
FacilityID:251580LocationID:330630
County:WELD #123Location:SENE 34 5N64W 6
Field:WATTENBERG - #90750Elevation:4664 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  660 FELLat/Long: 40.357726 / -104.528604Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.357778 / -104.528611Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 2/19/2025             Measured TD: 6988 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 2/19/2025
Wellbore PermitDRIFTED
Permit #:970266 Expiration Date:4/17/1998
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:5/13/1997
Spud Date:5/2/1997Spud Date Is:ACTUAL
Measured TD:6988 ft.Measured PB depth:6957 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR-CD-CN-DIL-CAL-CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 360 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 360 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 5880 ft., Depth: 6957 ft., Weight: 9.3 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 6142 ft., Bottom: 6957 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6574 ft.6690 ft.NN
CODELL6810 ft.6815 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/5/2008                  Interval Top: 6811 ft.    Interval Bottom: 6815 ft.

 Completed Information for Formation CODELL
1st Production Date:9/5/2008Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/13/1997
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 22
CALC_BBLS_H2O 6
CALC_BBLS_OIL 22
CALC_MCF_GAS 230
MCF_GAS 230
Perforation Data:
Interval Top:6811 ft.# Of Holes:
Interval Bottom:6815 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/19/2025                 Interval Top: 6560 ft.    Interval Bottom: 6822 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/25/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6560 ft.# Of Holes:402
Interval Bottom:6822 ft.Hole Size:0.32 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/18/2008                 Interval Top: 6560 ft.    Interval Bottom: 6713 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/25/2008Choke Size:0.250 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/15/2008
Treatment Summary:FRAC'D W/ 3,271 BBLS FRAC FLUID & 238,180# WHITE 20/40 SAND & 12,000# SB EXCEL 12/20 SAND.
Tubing Size:2.0625 in.Tubing Setting Depth:6552 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/18/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 18
BTU_GAS 1345
CALC_GOR 6611
CASING_PRESS 120
GRAVITY_OIL 49
MCF_GAS 119
TUBING_PRESS 525
Perforation Data:
Interval Top:6560 ft.# Of Holes:402
Interval Bottom:6713 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/19/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/06/2022
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No