|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/16/2022 Measured TD: 7870 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/16/2022 | | Wellbore Permit | | | Permit #: | 970095 | Expiration Date: | 2/5/1998 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 4/17/1997 | | Spud Date: | 3/10/1997 | Spud Date Is: | ACTUAL | | Measured TD: | 7870 ft. | Measured PB depth: | 7817 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 501 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 501 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7867 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 234, Top: 6330 ft., Bottom: 7867 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4846 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 3850 ft., Bottom: 4846 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | HYGIENE | 4686 ft. | | | | | NIOBRARA | 7040 ft. | | | | | FORT HAYS | 7298 ft. | | | | | CODELL | 7320 ft. | | | | | GREENHORN | 7364 ft. | | | | | GRANEROS | 7552 ft. | | | | | MOWRY | 7703 ft. | | | | | J SAND | 7720 ft. | | | | | SKULL CREEK | 7835 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 11/16/2022 Interval Top: 7743 ft. Interval Bottom: 7758 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7743 ft. | # Of Holes: | 60 | | Interval Bottom: | 7758 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/7/2019 Interval Top: 7322 ft. Interval Bottom: 7340 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7322 ft. | # Of Holes: | 72 | | Interval Bottom: | 7340 ft. | Hole Size: | 0.375 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/28/2009 Interval Top: 7096 ft. Interval Bottom: 7758 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/17/1997 | | Treatment Summary: | HOLE SIZES .38'' & .42'' / JSND-NBRR-CODL COMMINGLE. RELEASED RFP @ 7210'. 2/20/09. RELEASED PBP @ 7427' TO COMMINGLE THE JSND-NBRR-CODL. 2/23/09 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7712 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BBLS_OIL | 21 | | BTU_GAS | 1248 | | CALC_BBLS_H2O | 23 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 7714 | | CALC_MCF_GAS | 162 | | CASING_PRESS | 618 | | GRAVITY_OIL | 52 | | MCF_GAS | 162 | | TUBING_PRESS | 278 |
| | Perforation Data: | | Interval Top: | 7096 ft. | # Of Holes: | 166 | | Interval Bottom: | 7758 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/16/2022 Interval Top: 7096 ft. Interval Bottom: 7340 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/23/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/5/2009 | | Treatment Summary: | NB-CD REFRAC & RECOMPLETION. SEE OPERATORS COMMENT NEXT PAGE FOR DETAILS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7096 ft. | # Of Holes: | 106 | | Interval Bottom: | 7340 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/10/2019 Interval Top: 7096 ft. Interval Bottom: 7112 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/23/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7096 ft. | # Of Holes: | 34 | | Interval Bottom: | 7112 ft. | Hole Size: | 0.4166667 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/16/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|