Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19236
Well Classification: GW Status: PA - 8/10/2022
Well Name/No:LOUSTALET #41-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:59037
Facility Status:PAStatus Date8/10/2022
FacilityID:251433LocationID:330519
County:WELD #123Location:NENE 15 5N64W 6
Field:WATTENBERG - #90750Elevation:4568 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:747FNL  648 FELLat/Long: 40.404415 / -104.529444Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.404390 / -104.529560Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/10/2022             Measured TD: 6930 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/10/2022
Wellbore PermitDRIFTED
Permit #:960721 Expiration Date:10/15/1997
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:N/A
Spud Date:12/5/1996Spud Date Is:ACTUAL
Measured TD:6930 ft.Measured PB depth:6900 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 326 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 0 ft., Bottom: 326 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 6930 ft., Weight: 9.2 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 6076 ft., Bottom: 6930 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5236 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 670 ft., Bottom: 5236 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6410 ft.6650 ft.NN
FORT HAYS6680 ft.6695 ft.NN
CODELL6700 ft.6718 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/1/2008                  Interval Top: 6704 ft.    Interval Bottom: 6713 ft.

 Completed Information for Formation CODELL
1st Production Date:12/10/2004Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/30/2004
Treatment Summary:PERF'D NIOBRARA B 6531-6537' (12 HOLES), REPERF'D CODELL 6704-6710' (12 HOLES). FRAC'D NIOBRARA/CODELL USING 500 GALS 15% HCL, 3656 BBLS OF VISTAR 22 FLUID SYSTEM, 334040 LBS OF 20/40 WHITE SAND AND 16680 LBS OF SUPER LC 20/40 RESIN COATED PROPPANT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6704 ft.# Of Holes:64
Interval Bottom:6713 ft.Hole Size:0.25 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/1/2008                  Interval Top: 6526 ft.    Interval Bottom: 6537 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/22/2008
Treatment Summary:REPERF'D NIOBRARA B 6526-6536' (20 HOLES)/ REFRAC'D NIOBRARA USING 1000 GALS 15% HCL, 1670 BBLS SLICKWATER PAD, 143 BBLS OF SILVERSTIM 22 PAD, 2222 BBLS OF SILVERSTIM 22 FLUID SYSTEM, 238280 LBS OF 30/50 WHITE SAND AND 12000 LBS OF SB EXCEL 12/20 RESIN CO
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6526 ft.# Of Holes:32
Interval Bottom:6537 ft.Hole Size:0.25 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/10/2022                 Interval Top: 6523 ft.    Interval Bottom: 6713 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/10/2004Choke Size:0.313 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/30/2004
Treatment Summary:REPERF'D NIOBRARA B 6526-6536' (20 HOLES)/ REFRAC'D NIOBRARA USING 1000 GALS 15% HCL, 1670 BBLS SLICKWATER PAD, 143 BBLS OF SILVERSTIM 22 PAD, 2222 BBLS OF SILVERSTIM 22 FLUID SYSTEM, 238280 LBS OF 30/50 WHITE SAND AND 12000 LBS OF SB EXCEL 12/20 RESIN CO
Tubing Size:1.5 in.Tubing Setting Depth:6692 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 21
BTU_GAS 1321
CALC_BBLS_H2O 11
CALC_BBLS_OIL 21
CALC_GOR 8619
CALC_MCF_GAS 181
CASING_PRESS 550
GRAVITY_OIL 54
MCF_GAS 181
TUBING_PRESS 400
Perforation Data:
Interval Top:6523 ft.# Of Holes:84
Interval Bottom:6713 ft.Hole Size:0.25 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/10/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No