|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2025 Measured TD: 7005 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 1/6/2011 | | Proposed Depth/Form: | 7005 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 360, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 540 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 420, Top: 10 ft., Bottom: 540 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6995 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 225, Top: 5690 ft., Bottom: 6995 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/12/1996 | | Spud Date: | 7/29/1996 | Spud Date Is: | ACTUAL | | Measured TD: | 7005 ft. | Measured PB depth: | 6976 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIFL/GR: CBL; CDEN/GR/CNL/ML; SONIC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 531 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 540 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7003 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 5678 ft., Bottom: 6995 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 3989 ft. | | N | N | | NIOBRARA | 6122 ft. | | N | N | | FORT HAYS | 6376 ft. | | N | N | | D SAND | 6774 ft. | | N | N | | J SAND | 6846 ft. | | N | N |
Formation JSND Formation Classification: OW Status: SI - 7/1/2025 Interval Top: 6852 ft. Interval Bottom: 6864 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/1/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/11/2010 | | Treatment Summary: | FRAC JSND W/161,580 GAL SW & 115,050# 40/70 SAND & 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6814 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/27/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1951 | | CALC_MCF_GAS | 12 | | CASING_PRESS | 600 | | GRAVITY_OIL | 48 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 6852 ft. | # Of Holes: | 48 | | Interval Bottom: | 6864 ft. | Hole Size: | 0.38 in. |
|
Formation DSND Formation Classification: OW Status: AB - 6/29/2010 Interval Top: 6778 ft. Interval Bottom: 6804 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 9/12/1996 | Choke Size: | | | Formation Name: | D SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/4/2010 | | Treatment Summary: | DSND SQUEEZED W/75 SACKS OF CEMENT. | | Formation Treatment | | Treatment Date: | 9/12/1996 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00625762 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 95 | | CALC_GOR | 916 | | CASING_PRESS | 60 | | GRAVITY_OIL | 41 | | MCF_GAS | 87 | | TUBING_PRESS | 30 |
| | Perforation Data: | | Interval Top: | 6778 ft. | # Of Holes: | 52 | | Interval Bottom: | 6804 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.003 |
| Federal Financial Assurance | i | |
|
|