|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/11/2025 Measured TD: 7570 ft. Vertical TD: 7280 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/11/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 010078 | Expiration Date: | 1/15/2002 | | Proposed Top PZ Location: | Sec:29 Twp: 3N 67W | Footage: 655 FNL 1907 FEL | | Bottom Hole Location: | Sec:29 Twp: 3N 67W | Footage: 658 FNL 1915 FEL | | Proposed Depth/Form: | 7960 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2NE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 590 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 590 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7563 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 234, Top: 3730 ft., Bottom: 7563 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 1/19/1997 | Spud Date Is: | ACTUAL | | Measured TD: | 7570 ft. | Measured PB depth: | 7531 ft. | | True Vertical TD: | 7280 ft. | True Vertical PB depth: | 7241 ft. | | Top PZ Location: | Sec:29 Twp: 3N 67W | Footage: 655 FNL 1907 FEL | | Bottom Hole Location: | Sec:29 Twp: 3N 67W | Footage: 658 FNL 1915 FEL | | Log Types: | SATAILC, SATLD, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 590 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 590 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7563 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 234, Top: 6210 ft., Bottom: 7563 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6210 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 126, Top: 3730 ft., Bottom: 6210 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5700 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 120, Top: 5438 ft., Bottom: 5752 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7463 ft., Depth: 7986 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 30, Top: 7463 ft., Bottom: 7986 ft., Determination Method: CBL | | Casing: | String Type: NEW, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1500 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 926 ft., Bottom: 1500 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.3, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5328 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 4900 ft., Bottom: 5106 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4063 ft. | 4256 ft. | N | N | | SHANNON | 4645 ft. | | N | N | | NIOBRARA | 7156 ft. | | N | N | | FORT HAYS | 7377 ft. | | N | N | | CODELL | 7400 ft. | 7424 ft. | N | N | | J SAND | 7831 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 11/11/2025 Interval Top: 7833 ft. Interval Bottom: 7886 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/6/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2011 | | Treatment Summary: | SET SAND PLUG @ 7618 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7833 ft. | # Of Holes: | 94 | | Interval Bottom: | 7886 ft. | Hole Size: | 0.21 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/27/2024 Interval Top: 7402 ft. Interval Bottom: 7424 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/28/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7402 ft. | # Of Holes: | 116 | | Interval Bottom: | 7424 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/13/2011 Interval Top: 7196 ft. Interval Bottom: 7886 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.281 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | PLUNGER | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/17/2001 | | Treatment Summary: | FRAC'D J SAND W/499820# 20/40 MESH; 213055 GAL. GELLED FLUID J SAND PERFS; 7833'-7886' COMMINGLED WITH NB-CD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7785 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/6/2002 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 2 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 109500 | | CALC_MCF_GAS | 219 | | CASING_PRESS | 540 | | GRAVITY_OIL | 60 | | MCF_GAS | 219 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7196 ft. | # Of Holes: | | | Interval Bottom: | 7886 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/11/2025 Interval Top: 7192 ft. Interval Bottom: 7424 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/28/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/24/2011 | | Treatment Summary: | (8/23/11) CDL REPERF 7402-7424 HOLES 66 SIZE .38 (8/30/11) NB REPERF 7192-7338 HOLES 54 SIZE .44
Re-Frac Codell down 4-1/2" Csg w/ 201,600 gal Slickwater w/ 150,600# 40/70, 4,020# SB Excel.
Re-Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 243,558 gal Slickwater w/ 201,120# 40/70, 4,100# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 33 | | BTU_GAS | 1270 | | CALC_BBLS_OIL | 33 | | CALC_GOR | 5030 | | CALC_MCF_GAS | 166 | | CASING_PRESS | 1054 | | GRAVITY_OIL | 46 | | MCF_GAS | 166 | | TUBING_PRESS | 823 |
| | Perforation Data: | | Interval Top: | 7192 ft. | # Of Holes: | 232 | | Interval Bottom: | 7424 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/27/2024 Interval Top: 7192 ft. Interval Bottom: 7346 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/28/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7192 ft. | # Of Holes: | 116 | | Interval Bottom: | 7346 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/11/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 11/10/2025 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|