|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/26/2019 Measured TD: 7795 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/26/2019 | Wellbore Permit | | Permit #: | 20064731 | Expiration Date: | 10/30/2007 | Proposed Depth/Form: | 7820 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: N2SE | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 617 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 617 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7295 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 165, Top: 6370 ft., Bottom: 7295 ft. |
| | |
Wellbore Completed | Completion Date: | 12/9/2006 | Spud Date: | 12/6/2006 | Spud Date Is: | ACTUAL | Measured TD: | 7795 ft. | Measured PB depth: | 7762 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, SLIM ACCESS PEX-AIT | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 10 ft., Depth: 617 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 0 ft., Bottom: 617 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 10 ft., Depth: 7295 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 165, Top: 6375 ft., Bottom: 7295 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7191 ft., Depth: 7795 ft., Weight: 6.5 , Citings Type: ACTUAL | Cement: | Sacks: 50, Top: 7191 ft., Bottom: 7795 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4099 ft. | | | | SHANNON | 4590 ft. | | | | NIOBRARA | 6836 ft. | | | | FORT HAYS | 7126 ft. | | | | CODELL | 7147 ft. | | | | GREENHORN | 7198 ft. | | | | J SAND | 7615 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 9/26/2019 Interval Top: 7616 ft. Interval Bottom: 7658 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/9/2007 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/5/2007 | Treatment Summary: | 162,186 GALS FLUID & 4,000 LBS 12/20 SAND & 116,660 LBS 30/50 SAND J-DEEPENING , PERF, FRAC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7616 ft. | # Of Holes: | 126 | Interval Bottom: | 7658 ft. | Hole Size: | 0.21 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/9/2007 Interval Top: 6854 ft. Interval Bottom: 7658 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | 0.344 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/9/2007 | Treatment Summary: | NB PERFS 04/24/1999 6854-6956 CODL PERFS 04/24/1999 7154-7159 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7575 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/9/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 4 | CALC_BBLS_OIL | 4 | CALC_GOR | 19500 | CALC_MCF_GAS | 78 | CASING_PRESS | 1320 | GRAVITY_OIL | 53 | MCF_GAS | 78 | TUBING_PRESS | 1150 |
| Perforation Data: | Interval Top: | 6854 ft. | # Of Holes: | | Interval Bottom: | 7658 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/26/2019 Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/17/1996 | Choke Size: | 0.375 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | PLUNGER | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/9/2006 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7347 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/10/2002 | Test Method: | PLUNGER | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 23 | CALC_BBLS_OIL | 23 | CALC_GOR | 2391 | CALC_MCF_GAS | 55 | CASING_PRESS | 575 | GRAVITY_OIL | 60 | MCF_GAS | 55 | TUBING_PRESS | 525 |
| Perforation Data: | Interval Top: | | # Of Holes: | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 09/26/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|