Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18918
Well Classification: GW Status: PA - 1/29/2019
Well Name/No:HERREN #41-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:65566
Facility Status:PAStatus Date1/29/2019
FacilityID:251115LocationID:330338
County:WELD #123Location:NENE 33 3N67W 6
Field:WATTENBERG - #90750Elevation:4822 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:521FNL  510 FELLat/Long: 40.187926 / -104.887803Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.188081 / -104.887626Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/29/2019             Measured TD: 7878 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/29/2019
Wellbore Permit
Permit #:950210 Expiration Date:2/12/1999
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:4/3/1995
Spud Date:3/11/1995Spud Date Is:ACTUAL
Measured TD:7878 ft.Measured PB depth:7827 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 361 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 361 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 361 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 225, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7838 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 6350 ft., Bottom: 7838 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7838 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4280 ft.
SHANNON4710 ft.
NIOBRARA7000 ft.
J SAND7720 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/29/2019                 Interval Top: 7722 ft.    Interval Bottom: 7772 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7722 ft.# Of Holes:160
Interval Bottom:7772 ft.Hole Size:0.525 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/12/2009                 Interval Top: 7083 ft.    Interval Bottom: 7772 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/1995
Treatment Summary:JSND-NBRR-CDL COMMINGLE RELEASED RFP @ 7170'. 03-03-09. RELEASED TRBP @ 7390' TO COMMINGLE THE JSND-NBRR-CDL. 03-05-09
Tubing Size:2.375 in.Tubing Setting Depth:7709 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/12/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 37
BTU_GAS 1290
CALC_BBLS_H2O 9
CALC_BBLS_OIL 37
CALC_GOR 9081
CALC_MCF_GAS 336
CASING_PRESS 565
GRAVITY_OIL 52
MCF_GAS 336
TUBING_PRESS 323
Perforation Data:
Interval Top:7083 ft.# Of Holes:266
Interval Bottom:7772 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/29/2019                 Interval Top: 7083 ft.    Interval Bottom: 7302 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/5/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/2/2009
Treatment Summary:NBRR-CDL REFRAC & RECOMPLETION SET TRBP @ 7390'. 01-28-09. RE-FRAC'D THE CODELL WITH 111,888 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,500# 20/40 SAND. 02-02-09. SET RFP @ 7170'. 02-02-09. FRAC'D THE NIOBRARA WITH 153,510 GAL 18# (CONT)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7083 ft.# Of Holes:106
Interval Bottom:7302 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/25/1998

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
No Perforation Data was found for formation CODL.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/29/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No