Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18811
Well Classification: GW Status: PA - 3/18/2020
Well Name/No:RAGAN #N 14-08
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:67381
Facility Status:PAStatus Date3/18/2020
FacilityID:251008LocationID:330289
County:WELD #123Location:SENE 14 5N67W 6
Field:WATTENBERG - #90750Elevation:4935 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1972FNL  838 FELLat/Long: 40.401134 / -104.853984Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.401267 / -104.853969Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/22/2012
End Date: 1/22/2012
Reported: 2/8/2012
Prior to rule 205A.b.(2)(A)
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/18/2020             Measured TD: 7360 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/18/2020
Wellbore Permit
Permit #:941940 Expiration Date:6/24/1995
Proposed Depth/Form:
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:3/3/1995
Measured TD:7360 ft.Measured PB depth:7315 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 373 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 373 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 2.875 in., Top: 0 ft., Depth: 7356 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 6180 ft., Bottom: 7356 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHANNON4698 ft.
NIOBRARA6860 ft.
CODELL7178 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/7/2019                 Interval Top: 7178 ft.    Interval Bottom: 7201 ft.

 Completed Information for Formation CODELL
1st Production Date:3/3/1995Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/7/2019Treatment End Date:N/A
Treatment Summary:4/28/1998: Codell refrac 7184'-7194', 46 holse, 0.34 diameter, 3,026 bbls slurry, 334,840 lbs 20/40
Total fluid used in treatment (bbls):3026Max pressure during treatment (psi):4400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):334840Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7178 ft.# Of Holes:89
Interval Bottom:7201 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/18/2020                 Interval Top: 6861 ft.    Interval Bottom: 7201 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/3/1995Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/22/2012
Treatment Summary:Tri-Frac'd Codell w/ 141342 gals of Slick Water and Vistar with 254634#'s of Ottawa sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 20
BTU_GAS 1237
CALC_BBLS_H2O 15
CALC_BBLS_OIL 20
CALC_GOR 9050
CALC_MCF_GAS 181
CASING_PRESS 693
GRAVITY_OIL 58
MCF_GAS 181
TUBING_PRESS 288
Perforation Data:
Interval Top:6861 ft.# Of Holes:100
Interval Bottom:7201 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/7/2019                 Interval Top: 6861 ft.    Interval Bottom: 7001 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/3/1995Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6861 ft.# Of Holes:11
Interval Bottom:7001 ft.Hole Size:0.25 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/18/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No