|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 1/24/2023 Measured TD: 7470 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 1/24/2023 | Wellbore Permit | | Permit #: | 19941893 | Expiration Date: | 6/13/1995 | Proposed Depth/Form: | 7465 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SW |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 1/4/1995 | Spud Date Is: | ACTUAL | Measured TD: | 7470 ft. | Measured PB depth: | 7425 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIL/SFL/GR; CBL; CDEN/GR | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 567 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: 0 ft., Bottom: 567 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7466 ft., Weight: 7.7 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 6542 ft., Bottom: 7466 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 3.5 in., Top: , Depth: 7466 ft., Weight: 7.7 , Citings Type: ACTUAL | Cement: | Sacks: 410, Top: 3895 ft., Bottom: 5150 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 3895 ft., Depth: 5014 ft., Bottom: 5150 ft., Sacks: 410, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 100 ft. | | N | N | SUSSEX | 4312 ft. | | N | N | SHANNON | 4781 ft. | | N | N | NIOBRARA | 7009 ft. | | N | N | FORT HAYS | 7273 ft. | | N | N | CODELL | 7294 ft. | | N | N | GREENHORN | 7376 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 11/23/2010 Interval Top: 7296 ft. Interval Bottom: 7314 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/17/2010 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/5/2010 | Treatment Summary: | REPERF CODL 7296-7314 HOLES 36 SIZE 0.50. TRI-FRAC CODL W/203,108 GAL SW & 151,180# 40/70 SAND & 4,000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7296 ft. | # Of Holes: | 86 | Interval Bottom: | 7314 ft. | Hole Size: | 0.5 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/24/2023 Interval Top: 7014 ft. Interval Bottom: 7314 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/17/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/5/2010 | Treatment Summary: | NBRR PERF 7014-7170 HOLES 67 SIZE 0.50 CODL PERF 7296-7314 HOLES 86 SIZE 0.50 | Formation Treatment | Treatment Date: | 2/6/1995 | Treatment Summary: | FRAC'D W/400,000# 20/40 + 101,598 GAL GELLED FLUID. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 25 | BTU_GAS | 1218 | CALC_BBLS_OIL | 4 | CALC_GOR | 60000 | CALC_MCF_GAS | 240 | CASING_PRESS | 1500 | GRAVITY_OIL | 56 | MCF_GAS | 249 | TUBING_PRESS | 600 |
| Perforation Data: | Interval Top: | 7014 ft. | # Of Holes: | 153 | Interval Bottom: | 7314 ft. | Hole Size: | 0.5 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/23/2010 Interval Top: 7014 ft. Interval Bottom: 7170 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/17/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/5/2010 | Treatment Summary: | REPERF NBRR 7014-7170 HOLES 64 SIZE 0.50. REFRAC NBRR W/245,791 GAL SW & 2000,060# 40/70 SAND & 4,000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7014 ft. | # Of Holes: | 67 | Interval Bottom: | 7170 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
Reported Plugged | Y | 01/24/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|