Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18775
Well Classification: GW Status: PA - 10/24/2023
Well Name/No:ARISTOCRAT #21-10C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/24/2023
FacilityID:250972LocationID:332718
County:WELD #123Location:NENW 10 3N65W 6
Field:WATTENBERG - #90750Elevation:4808 ft.
Planned Location:584FNL  1991 FWLLat/Long: 40.245497 / -104.651667Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.245141 / -104.651881Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/24/2023             Measured TD: 7283 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/24/2023
Wellbore PermitDRIFTED
Permit #:19941868 Expiration Date:6/4/1995
Proposed Depth/Form:7300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4

Wellbore Completed
Completion Date:2/25/1995
Spud Date:12/22/1994Spud Date Is:ACTUAL
Measured TD:7283 ft.Measured PB depth:7590 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL / LDL / CNL - GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 585 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 585 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7268 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 6400 ft., Bottom: 7268 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4700 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 3742 ft., Bottom: 4700 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4420 ft.NN
NIOBRARA6815 ft.NN
FORT HAYS7095 ft.NN
CODELL7116 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/18/2023                 Interval Top: 7118 ft.    Interval Bottom: 7132 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7118 ft.# Of Holes:28
Interval Bottom:7132 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/24/2023                Interval Top: 6852 ft.    Interval Bottom: 7132 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/30/2009
Treatment Summary:NBRR-CDL COMMINGLE, DRILLED OUT CBP @ 7070' TO COMMINGLE THE NBRR-CDL. 7/24/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 5
BTU_GAS 1032
CALC_BBLS_H2O 8
CALC_BBLS_OIL 5
CALC_GOR 28000
CALC_MCF_GAS 140
CASING_PRESS 467
GRAVITY_OIL 63
MCF_GAS 140
TUBING_PRESS 156
Perforation Data:
Interval Top:6852 ft.# Of Holes:148
Interval Bottom:7132 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/4/2023                  Interval Top: 6852 ft.    Interval Bottom: 7040 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/25/1995
Treatment Summary:PERF'D NBRR FROM 6860-6890, 7010-7040 W/2 SPF. SET CBP @ 7090. FRAC'D W/ 138,200 GAL FRAC FLUID AND 200,620# SAND. FLOW BACK FRAC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 3
CALC_BBLS_H2O 2
CALC_BBLS_OIL 3
CALC_GOR 18333
CALC_MCF_GAS 55
CASING_PRESS 830
MCF_GAS 55
Perforation Data:
Interval Top:6852 ft.# Of Holes:120
Interval Bottom:7040 ft.Hole Size:0.33 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/24/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No