Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18575
Well Classification: OW Status: PA - 8/26/2025
Well Name/No:BROWN C UNIT #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/26/2025
FacilityID:250772LocationID:330179
County:WELD #123Location:NWNW 5 1N68W 6
Field:WATTENBERG - #90750Elevation:5000 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1000FNL  1000 FWLLat/Long: 40.084937 / -105.033437Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.085008 / -105.033419Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 8/26/2025             Measured TD: 8275 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 8/26/2025
Wellbore Permit
Permit #:19941346 Expiration Date:9/14/1995
Proposed Depth/Form:8300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JNBCD , Formation: J-NIOBRARA-CODELL , Order: 232;407 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: 316 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:7/17/1995
Spud Date:3/24/1995Spud Date Is:ACTUAL
Measured TD:8275 ft.Measured PB depth:8215 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:DIL, FDC, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 658 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 658 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 8271 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 7316 ft., Bottom: 8271 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7312 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 6700 ft., Bottom: 7312 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5288 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 4028 ft., Bottom: 5288 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4332 ft.
SHANNON4982 ft.
NIOBRARA7355 ft.
CODELL7684 ft.
GREENHORN7779 ft.
J SAND8117 ft.
SKULL CREEK8150 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 8/26/2025                 Interval Top: 8121 ft.    Interval Bottom: 8146 ft.

 Completed Information for Formation J SAND
1st Production Date:4/17/1995Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/17/1995
Treatment Summary:FRAC W/ 530,000# 20/40 SAND IN 165,018 GAL FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 1
CASING_PRESS 460
MCF_GAS 60
TUBING_PRESS 180
Perforation Data:
Interval Top:8121 ft.# Of Holes:50
Interval Bottom:8146 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/19/2025                 Interval Top: 7687 ft.    Interval Bottom: 7699 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7687 ft.# Of Holes:8
Interval Bottom:7699 ft.Hole Size:0.27 in.

Formation NB-CD                   Formation Classification:  OG                   Status:  AB - 8/26/2025                 Interval Top: 7458 ft.    Interval Bottom: 7699 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/17/1995Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/17/1995
Treatment Summary:ACIDIZE W/ 24 BBL 10% HCL, FRAC W/ 400,000# 20/40 SAND IN 123,648 GAL FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 33
CALC_GOR 7757
MCF_GAS 256
TUBING_PRESS 420
Perforation Data:
Interval Top:7458 ft.# Of Holes:15
Interval Bottom:7699 ft.Hole Size:0.27 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 3/19/2025                 Interval Top: 7458 ft.    Interval Bottom: 7590 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7458 ft.# Of Holes:7
Interval Bottom:7590 ft.Hole Size:0.27 in.

Formation SNSD                     Formation Classification:  OG                     Status:  AB - 8/26/2025                 Interval Top: 4983 ft.    Interval Bottom: 4998 ft.

 Completed Information for Formation SHANNON
1st Production Date:11/1/1996Choke Size: 
Formation Name:SHANNONCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 20
CALC_GOR 2000
MCF_GAS 40
Perforation Data:
Interval Top:4983 ft.# Of Holes:8
Interval Bottom:4998 ft.Hole Size:0.33 in.

Formation JNCSS                   Formation Classification:  OW                   Status:  CM - 1/1/2020                  Interval Top: 4549 ft.    Interval Bottom: 8146 ft.

 Completed Information for Formation JSND-CODL-NIO-SUSX-SHAN
1st Production Date:12/17/1996Choke Size: 
Formation Name:JSND-CODL-NIO-SUSX-SHANCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:4361 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/1/1997Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 25
CALC_GOR 5800
CASING_PRESS 680
MCF_GAS 145
TUBING_PRESS 60
Perforation Data:
Interval Top:4549 ft.# Of Holes:81
Interval Bottom:8146 ft.Hole Size:

Formation SUSX                     Formation Classification:  OG                     Status:  AB - 8/26/2025                 Interval Top: 4549 ft.    Interval Bottom: 4556 ft.

 Completed Information for Formation SUSSEX
1st Production Date:11/1/1996Choke Size: 
Formation Name:SUSSEXCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 20
CALC_GOR 2000
MCF_GAS 40
Perforation Data:
Interval Top:4549 ft.# Of Holes:8
Interval Bottom:4556 ft.Hole Size:0.33 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/26/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No