Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18511
Well Classification: OW Status: PA - 7/25/2024
Well Name/No:GEHRING #8-9I4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:62342
Facility Status:PAStatus Date7/25/2024
FacilityID:250708LocationID:330148
County:WELD #123Location:NESE 8 4N64W 6
Field:WATTENBERG - #90750Elevation:4741 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2039FSL  536 FELLat/Long: 40.325256 / -104.566885Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.325260 / -104.566970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/12/2024             Measured TD: 7071 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/12/2024
Wellbore PermitDRIFTED
Permit #:941184 Expiration Date:3/1/1995
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2SE

Wellbore Completed
Completion Date:10/14/1994
Measured TD:7071 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 9.875 in., Size: , Top: 0 ft., Depth: 497 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 0 ft., Bottom: 497 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 6.25 in., Size: 3.5 in., Top: 0 ft., Depth: 7064 ft., Weight: 7.7 , Citings Type: ACTUAL
Cement:Sacks: 84, Top: 6180 ft., Bottom: 7064 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 6.25 in., Size: 3.5 in., Top: 0 ft., Depth: 4862 ft., Weight: 7.7 , Citings Type: ACTUAL
Cement:Sacks: 134, Top: 4166 ft., Bottom: 4862 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3622 ft.
SUSSEX4380 ft.
NIOBRARA6631 ft.
FORT HAYS6914 ft.
CODELL6938 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/17/2003                 Interval Top: 6939 ft.    Interval Bottom: 6952 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/14/1994
Treatment Summary:132,300 GAL SILVER-STIM GEL & 245,540# 20/40 OTTAWA SAND, 1/06/03
Tubing Size:Tubing Setting Depth:6877 ft.
Tubing Packer Depth:6877 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/17/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 32
CALC_BBLS_H2O 17
CALC_BBLS_OIL 32
CALC_GOR 14
CALC_MCF_GAS 457
MCF_GAS 457
TUBING_PRESS 460
Perforation Data:
Interval Top:6939 ft.# Of Holes:52
Interval Bottom:6952 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/25/2024                 Interval Top: 6652 ft.    Interval Bottom: 6952 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/14/1994
Treatment Summary:COMMINGLE NBRR & CODL
Tubing Size:2.0625 in.Tubing Setting Depth:6916 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/8/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 22
BTU_GAS 1240
CALC_GOR 6955
CASING_PRESS 470
GRAVITY_OIL 54
MCF_GAS 153
TUBING_PRESS 190
Perforation Data:
Interval Top:6652 ft.# Of Holes:164
Interval Bottom:6952 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/8/2008                  Interval Top: 6652 ft.    Interval Bottom: 6762 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/18/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/17/2008
Treatment Summary:FRAC'D NBRR W/181,152 GALS SILVERSTIM & SLICKWATER & 249,720# OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6652 ft.# Of Holes:112
Interval Bottom:6762 ft.Hole Size:0.27 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/25/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No