Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18471
Well Classification: OW Status: PA - 10/19/2018
Well Name/No:HSR-NILES #3-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/19/2018
FacilityID:250668LocationID:332912
County:WELD #123Location:NENW 33 3N66W 6
Field:WATTENBERG - #90750Elevation:4935 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:460FNL  1780 FWLLat/Long: 40.187437 / -104.785050Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.187430 / -104.785300Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/19/2018             Measured TD: 7546 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/19/2018
Wellbore PermitDRIFTED
Permit #:19941042 Expiration Date:2/7/1995
Proposed Depth/Form:7510 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NW

Wellbore Completed
Completion Date:9/8/1994
Spud Date:8/18/1994Spud Date Is:ACTUAL
Measured TD:7546 ft.Measured PB depth:7464 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/SFL/GR; CBL; CDEN/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 695 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 485, Top: 0 ft., Bottom: 695 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 2.875 in., Top: 0 ft., Depth: 7543 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6312 ft., Bottom: 7543 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7543 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 3880 ft., Bottom: 5228 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS100 ft.200 ft.NN
SUSSEX4490 ft.4600 ft.NN
NIOBRARA7125 ft.7372 ft.NN
FORT HAYS7372 ft.7394 ft.NN
CODELL7394 ft.7402 ft.NN
CARLILE7402 ft.7453 ft.NN
GREENHORN7453 ft.NN

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/19/2018                Interval Top: 7176 ft.    Interval Bottom: 7406 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/8/1994Choke Size:0.281 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:PLUNGER
Open Hole Completion:
Formation Treatment
Treatment Date:9/8/1994
Treatment Summary:7125-7402' FRAC'D CODL W/412,030# 20/40 MESH + 106,848 GAL. GELLED FLUID, 1994. // REPERF'D CODL 7396'-7406' .REFRAC. CODL 6020 # 100 MESH; 261,020 # 20/40 MESH; 90,326 GAL. GELLED FLUID, 4/26/2002.
Tubing Size:1.25 in.Tubing Setting Depth:7362 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/19/2002Test Method:PLUNGER LIFT
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 19
CALC_BBLS_H2O 0
CALC_BBLS_OIL 19
CALC_GOR 5789
CALC_MCF_GAS 110
CASING_PRESS 550
GRAVITY_OIL 60
MCF_GAS 110
TUBING_PRESS 350
Perforation Data:
Interval Top:7176 ft.# Of Holes:
Interval Bottom:7406 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/19/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No