Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18440
Well Classification: OW Status: PA - 4/8/2021
Well Name/No:GAMEWELL #34-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:69079
Facility Status:PAStatus Date4/8/2021
FacilityID:250637LocationID:330123
County:WELD #123Location:SWNE 34 5N64W 6
Field:WATTENBERG - #90750Elevation:4672 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  1980 FELLat/Long: 40.357696 / -104.533344Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.357468 / -104.533448Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/8/2021             Measured TD: 6995 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/8/2021
Wellbore PermitDRIFTED
Permit #:940967 Expiration Date:1/25/1995
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2NE

Wellbore Completed
Completion Date:10/25/1994
Measured TD:6995 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 362 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 362 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 362 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 250, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 6994 ft., Weight: 12.95 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6051 ft., Bottom: 6994 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 6994 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6538 ft.
CODELL6814 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/12/2008                 Interval Top: 6814 ft.    Interval Bottom: 6824 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/25/1994
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6814 ft.# Of Holes:
Interval Bottom:6824 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/8/2021                  Interval Top: 6536 ft.    Interval Bottom: 6821 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/25/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/19/2010
Treatment Summary:DRILLED OUT CIBP AT 6774'. COMMINGLED NIOBRARA ANS CODELL.
Tubing Size:2.0625 in.Tubing Setting Depth:6779 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 3
BTU_GAS 1345
CALC_GOR 3315
CASING_PRESS 630
GRAVITY_OIL 53
MCF_GAS 9
TUBING_PRESS 260
Perforation Data:
Interval Top:6536 ft.# Of Holes:484
Interval Bottom:6821 ft.Hole Size:0.32 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/7/2008                 Interval Top: 6536 ft.    Interval Bottom: 6718 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/3/2008Choke Size:0.250 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/16/2008
Treatment Summary:FRAC'D W/ 4,144 BBLS FRAC FLUID & 239,140# OTTAWA 30/50 SAND & 12,000# SB EXCEL 12/20 SAND.
Tubing Size:2.0625 in.Tubing Setting Depth:6529 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/7/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 32
BTU_GAS 1367
CALC_GOR 5594
CASING_PRESS 550
GRAVITY_OIL 50
MCF_GAS 179
TUBING_PRESS 250
Perforation Data:
Interval Top:6536 ft.# Of Holes:420
Interval Bottom:6718 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/08/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No