Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18213
Well Classification: GW Status: PA - 7/31/2020
Well Name/No:HAYES FEDERAL #31-8H5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:61562
Facility Status:PAStatus Date7/31/2020
FacilityID:250410LocationID:330020
County:WELD #123Location:SENE 31 5N65W 6
Field:WATTENBERG - #90750Elevation:4659 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2140FNL  847 FELLat/Long: 40.357075 / -104.699689Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.357203 / -104.699905Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 7/31/2020             Measured TD: 7300 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 7/31/2020
Wellbore PermitDRIFTED
Permit #:940461 Expiration Date:10/15/1994
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:5/7/1994
Measured TD:7300 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: , Top: , Depth: 452 ft., Weight: 17.00 , Citings Type: ACTUAL
Cement:Sacks: 186, Top: 0 ft., Bottom: 452 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: , Depth: 7292 ft., Weight: 7.70 , Citings Type: ACTUAL
Cement:Sacks: 94, Top: 6280 ft., Bottom: 7292 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3561 ft.
SUSSEX4092 ft.
NIOBRARA6801 ft.
FORT HAYS7061 ft.
CODELL7083 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/22/2008                 Interval Top: 7084 ft.    Interval Bottom: 7096 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/7/1994
Treatment Summary:132,930 GAL VISTAR 28/26# GEL & 245,800# 20/40 OTTAWA SAND
Tubing Size:2.375 in.Tubing Setting Depth:7017 ft.
Tubing Packer Depth:7017 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/1/2002Test Method:FLOWING
Hours Tested:16Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 17
CALC_BBLS_H2O 6
CALC_BBLS_OIL 26
CALC_GOR 19
CALC_MCF_GAS 496
CASING_PRESS 875
MCF_GAS 331
Perforation Data:
Interval Top:7084 ft.# Of Holes:48
Interval Bottom:7096 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/31/2020                 Interval Top: 6904 ft.    Interval Bottom: 7096 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/7/1994
Treatment Summary:
Tubing Size:2.0625 in.Tubing Setting Depth:7066 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/22/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 10
BTU_GAS 1266
CALC_GOR 13400
CASING_PRESS 450
GRAVITY_OIL 58
MCF_GAS 134
TUBING_PRESS 200
Perforation Data:
Interval Top:6904 ft.# Of Holes:104
Interval Bottom:7096 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/30/2007                Interval Top: 6904 ft.    Interval Bottom: 6918 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/16/2007Choke Size:0.250 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/15/2007
Treatment Summary:RE-FRAC'D NIOBRARA WITH 98,658 GALS FO SILVERSTEM WITH 28# GEL LOADINGS AND 250,220 #OF 30/50 OTTAWA SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 23
BTU_GAS 1270
CALC_GOR 11348
CASING_PRESS 250
GRAVITY_OIL 60
MCF_GAS 261
TUBING_PRESS 0
Perforation Data:
Interval Top:6904 ft.# Of Holes:56
Interval Bottom:6918 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/31/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No