Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18175
Well Classification: OW Status: PA - 9/30/2019
Well Name/No:FERGUSON #24-5H4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:61497
Facility Status:PAStatus Date9/30/2019
FacilityID:250372LocationID:336587
County:WELD #123Location:NESE 23 5N64W 6
Field:WATTENBERG - #90750Elevation:4590 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1796FSL  755 FELLat/Long: 40.382376 / -104.510473Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.382490 / -104.510310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 9/30/2019             Measured TD: 7607 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 9/30/2019
Wellbore PermitDIRECTIONAL
Permit #:940382 Expiration Date:9/26/1994
Bottom Hole Location:Sec:24 Twp: 5N 64W Footage: 1967 FNL  665 FWL
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: S/2NW4

Wellbore Completed
Completion Date:4/13/1994
Spud Date:4/6/1994Spud Date Is:ACTUAL
Measured TD:7607 ft.Measured PB depth:7545 ft.
True Vertical TD:True Vertical PB depth:
Bottom Hole Location:Sec:24 Twp: 5N 64WFootage: 1967 FNL  665 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 11 ft., Depth: 491 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 491 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 11 ft., Depth: 7577 ft., Weight: 7.7 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6333 ft., Bottom: 7577 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4430 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 3850 ft., Bottom: 4430 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 3530 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 3160 ft., Bottom: 3530 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3407 ft.
SUSSEX4283 ft.
NIOBRARA7117 ft.
FORT HAYS7379 ft.
CODELL7401 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/3/2002                  Interval Top: 7402 ft.    Interval Bottom: 7411 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.500 in.
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/29/1994
Treatment Summary:131,838 GAL VISTAR 28/26# GEL & 246,420 # 20/40 OTTAWA SAND
Tubing Size:2.0625 in.Tubing Setting Depth:7385 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/3/2002Test Method:FLOWING
Hours Tested:4Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 15
CALC_BBLS_H2O 19
CALC_BBLS_OIL 95
CALC_GOR 5000
CALC_MCF_GAS 436
CASING_PRESS 555
MCF_GAS 69
TUBING_PRESS 425
Perforation Data:
Interval Top:7402 ft.# Of Holes:36
Interval Bottom:7411 ft.Hole Size:0.2 in.

Formation NB-CD                   Formation Classification:  OG                   Status:  AB - 9/30/2019                 Interval Top: 7140 ft.    Interval Bottom: 7411 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/21/2011Choke Size:40.000 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/13/2011
Treatment Summary:Codell perfs 7402-7411. Tri-Frac codell w/ 140,339 gals of Slick Water and Vistar with 245,000#'s of Ottawa sand. Commingle Codell and Niobrara.
Formation Treatment
Treatment Date:4/29/1994
Treatment Summary:COMMINGLE CODELL LAND NIOBRARA
Tubing Size:2.0625 in.Tubing Setting Depth:7377 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/28/2011Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 4
BTU_GAS 1316
CALC_BBLS_H2O 5
CALC_BBLS_OIL 4
CALC_GOR 8500
CALC_MCF_GAS 34
CASING_PRESS 500
GRAVITY_OIL 57
MCF_GAS 34
TUBING_PRESS 380
Perforation Data:
Interval Top:7140 ft.# Of Holes:188
Interval Bottom:7411 ft.Hole Size:

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 12/27/2011                Interval Top: 7140 ft.    Interval Bottom: 7270 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/11/2007
Treatment Summary:FRAC NBRR W/1000 GAL OF 15% HCL 69,972 GAL OF SLICKWATER 97,944 GALS SILVERSTIM 28 AND 250,420#'S 30/50 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7140 ft.# Of Holes:152
Interval Bottom:7270 ft.Hole Size:0.27 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/30/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No