|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/13/2023 Measured TD: 7820 ft. Vertical TD: 7799 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/13/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 940371 | Expiration Date: | 9/25/1994 | | Bottom Hole Location: | Sec:24 Twp: 5N 64W | Footage: 1967 FNL 1996 FWL | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: S2NE |
| | |
| Wellbore Completed | | Completion Date: | 4/6/1994 | | Spud Date: | 3/29/1994 | Spud Date Is: | ACTUAL | | Measured TD: | 7820 ft. | Measured PB depth: | 7760 ft. | | True Vertical TD: | 7799 ft. | True Vertical PB depth: | 7749 ft. | | Top PZ Location: | Sec:24 Twp: 5N 64W | Footage: 2006 FNL 2009 FWL | | Bottom Hole Location: | Sec:24 Twp: 5N 64W | Footage: 1984 FNL 2042 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 489 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 489 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7799 ft., Weight: 7.7 , Citings Type: ACTUAL | | Cement: | Sacks: 210, Top: 6606 ft., Bottom: 7799 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 3508 ft., Weight: 7.7 , Citings Type: ACTUAL | | Cement: | Sacks: 292, Top: 1320 ft., Bottom: 3570 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3693 ft. | | | | | SUSSEX | 4360 ft. | | | | | NIOBRARA | 7334 ft. | | | | | FORT HAYS | 7596 ft. | | | | | CODELL | 7620 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 8/26/2022 Interval Top: 7625 ft. Interval Bottom: 7637 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/14/1994 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/10/2009 | | Treatment Summary: | REMOVE PLUS TO COMMINGLE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 22 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 5 | | CALC_MCF_GAS | 110 | | MCF_GAS | 110 | | TUBING_PRESS | 190 |
| | Perforation Data: | | Interval Top: | 7625 ft. | # Of Holes: | 57 | | Interval Bottom: | 7637 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/13/2023 Interval Top: 7356 ft. Interval Bottom: 7637 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/14/1994 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/10/2009 | | Treatment Summary: | NIOBRARA PERFS 7356-7470. RE-FRAC'D NIOBRARA W/ 174,169 GALS OF SLICK WATER, VISTAR AND 15% HCI WITH 248,100#S OF OTTAWA SAND. COMMINGLE CODELL AND NIOBRARA. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 8 | | BTU_GAS | 1323 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 5625 | | CALC_MCF_GAS | 45 | | CASING_PRESS | 975 | | GRAVITY_OIL | 57 | | MCF_GAS | 45 | | TUBING_PRESS | 850 |
| | Perforation Data: | | Interval Top: | 7356 ft. | # Of Holes: | 223 | | Interval Bottom: | 7637 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 8/26/2022 Interval Top: 7356 ft. Interval Bottom: 7470 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/14/1994 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7356 ft. | # Of Holes: | 166 | | Interval Bottom: | 7470 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/13/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|