|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 8/10/2021 Measured TD: 7378 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 8/10/2021 | Wellbore Permit | | Permit #: | 19940363 | Expiration Date: | 9/21/1994 | Proposed Depth/Form: | 7425 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SE |
| | |
Wellbore Completed | Completion Date: | 5/2/1994 | Spud Date: | 4/7/1994 | Spud Date Is: | ACTUAL | Measured TD: | 7378 ft. | Measured PB depth: | 7352 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CNL/GR; CBL/CCL/GR | Casing: | String Type: SURF, Hole Size: 9.875 in., Size: , Top: 0 ft., Depth: 749 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 0 ft., Bottom: 749 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 6.25 in., Size: 3.5 in., Top: 0 ft., Depth: 7420 ft., Weight: 7.7 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 6252 ft., Bottom: 7420 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5030 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 125, Top: 4030 ft., Bottom: 5030 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3973 ft. | | N | N | SUSSEX | 4536 ft. | | N | N | NIOBRARA | 6923 ft. | | N | N | FORT HAYS | 7208 ft. | | N | N | CODELL | 7232 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 9/21/2005 Interval Top: 7235 ft. Interval Bottom: 7245 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/10/1994 | Choke Size: | 0.375 in. | Formation Name: | CODELL | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/2/1994 | Treatment Summary: | FRAC W/45,250 GALS WTR W/CLAYTREAT W/ 35# GUAR & 190,000# 20/40 MESH SAND, MAY,94. // 132,468 GAL VISTAR 24/25/26# GEL & 246,060# 20/40 OTTAWA SAND, 7/10/03. |
| Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 7218 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/25/2003 | Test Method: | FLOWING | Hours Tested: | 6 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 15 | BTU_GAS | 1271 | CALC_BBLS_H2O | 8 | CALC_BBLS_OIL | 60 | CALC_GOR | 6733 | CALC_MCF_GAS | 404 | CASING_PRESS | 600 | GRAVITY_OIL | 54.2 | MCF_GAS | 101 | TUBING_PRESS | 440 |
| Perforation Data: | Interval Top: | 7235 ft. | # Of Holes: | 40 | Interval Bottom: | 7245 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/10/2021 Interval Top: 6992 ft. Interval Bottom: 7245 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/9/2005 | Choke Size: | 0.188 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/2/1994 | Treatment Summary: | COMMINGLE NIOBRARA AND CODELL; CODELL PERFS: 7235 - 7245, 60 HOLES |
| Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 7218 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/21/2005 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 28 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 28 | CALC_GOR | 5643 | CALC_MCF_GAS | 158 | CASING_PRESS | 640 | MCF_GAS | 158 | TUBING_PRESS | 180 |
| Perforation Data: | Interval Top: | 6992 ft. | # Of Holes: | 204 | Interval Bottom: | 7245 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 9/21/2005 Interval Top: 6992 ft. Interval Bottom: 7090 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/9/2005 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/6/2005 | Treatment Summary: | PERF'D NBRR 6992-7010' (108 HOLES) & 7084-7090' (36 HOLES) 8/17/05. 1,000 GAL 15% HCI ACID BREAKDOWN.. FRAC'D NBRR W/ 70,014 GAL SLICKWATER; 99,708 GAL SILVERSTIM 28# GEL; 28,620# 30/50 OTTAWA SAND; & 12,000# 12/20 SB EXCEL, 9/6/2005. ATP:5894 PSI, ATR: 42.7 BPM. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6992 ft. | # Of Holes: | 144 | Interval Bottom: | 7090 ft. | Hole Size: | 0.27 in. |
|
|
|
|
|
Reported Plugged | Y | 08/10/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|