Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17930
Well Classification: OW Status: PA - 2/26/2024
Well Name/No:HSR-WILLIAM MAYER #5-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:61352
Facility Status:PAStatus Date2/26/2024
FacilityID:250127LocationID:329847
County:WELD #123Location:SWNW 22 3N67W 6
Field:WATTENBERG - #90750Elevation:4799 ft.
Planned Location:1846FNL  508 FWLLat/Long: 40.213386 / -104.884264Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.213384 / -104.884208Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/26/2024             Measured TD: 7230 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/26/2024
Wellbore Permit
Permit #:19980859 Expiration Date:9/17/1999
Proposed Depth/Form:7240 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW

Wellbore Completed
Completion Date:3/8/1994
Spud Date:2/5/1994Spud Date Is:ACTUAL
Measured TD:7230 ft.Measured PB depth:7160 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/SFL/GR; CBL; DEN/CNL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 612 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 612 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7184 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 6176 ft., Bottom: 7184 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2820 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 1940 ft., Bottom: 2820 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7144 ft., Depth: 7658 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 7144 ft., Bottom: 7658 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS200 ft.400 ft.NN
SUSSEX4190 ft.4254 ft.NN
SHANNON4555 ft.4620 ft.NN
NIOBRARA6815 ft.7050 ft.NN
FORT HAYS7050 ft.7071 ft.NN
CODELL7071 ft.7094 ft.NN
CARLILE7094 ft.7125 ft.NN
GREENHORN7125 ft.
J SAND7501 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 2/26/2024                 Interval Top: 7501 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/1994
Treatment Summary:FRACD W/ 562876# 20/40 MESH ; 237972 GAL GELLED FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 2/6/2007                  Interval Top: 6873 ft.    Interval Bottom: 7551 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.563 in.
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:PLUNGER
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/1994
Treatment Summary:CUMMINGLED JNBCD
Tubing Size:2.375 in.Tubing Setting Depth:7440 ft.
Tubing Packer Depth:36 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/20/2003Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 11
CALC_BBLS_H2O 0
CALC_BBLS_OIL 11
CALC_GOR 27727
CALC_MCF_GAS 305
CASING_PRESS 390
GRAVITY_OIL 60
MCF_GAS 305
TUBING_PRESS 225
Perforation Data:
Interval Top:6873 ft.# Of Holes:
Interval Bottom:7551 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/26/2024                 Interval Top: 6873 ft.    Interval Bottom: 7080 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/8/1994Choke Size:0.563 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:PLUNGER
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/1994
Treatment Summary:FRACD W/ 415,100# 20/40 MESH SAND PLUS 110,391 GAL GELLED FLUID. // REFRAC CODL #100 MESH 261240 #20/40 MESH 90664 GAL. GELLED FLUID REPERFORATED CODELL FROM 7974'-7984' TEST PRODUCTION REPRESENTS NB-CD FORMATIONS
Tubing Size:2.375 in.Tubing Setting Depth:7045 ft.
Tubing Packer Depth:7990 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/15/2002Test Method:PLUNGER
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 10
CALC_BBLS_OIL 10
CALC_GOR 12700
CALC_MCF_GAS 127
CASING_PRESS 575
GRAVITY_OIL 60
MCF_GAS 127
TUBING_PRESS 375
Perforation Data:
Interval Top:6873 ft.# Of Holes:18
Interval Bottom:7080 ft.Hole Size:0.31 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/26/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No