|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/2/2022 Measured TD: 7686 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/2/2022 | Wellbore Permit | | Permit #: | 20001475 | Expiration Date: | 12/17/2001 | Proposed Depth/Form: | 7700 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2NW |
| | |
Wellbore Completed | Completion Date: | 1/26/2001 | Spud Date: | 2/8/1994 | Spud Date Is: | ACTUAL | Measured TD: | 7686 ft. | Measured PB depth: | 7185 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CDCNGR, IGR, CBL // DIL/SFL/GR; CBL; DEN/CNL/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 624 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 435, Top: 0 ft., Bottom: 624 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7219 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 6130 ft., Bottom: 7219 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7161 ft., Depth: 7685 ft., Weight: 6.5 , Citings Type: ACTUAL | Cement: | Sacks: 35, Top: 7161 ft., Bottom: 7685 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 100 ft. | | N | N | SUSSEX | 4104 ft. | | N | N | SHANNON | 4510 ft. | | N | N | NIOBRARA | 6825 ft. | | N | N | FORT HAYS | 7076 ft. | | N | N | CODELL | 7096 ft. | | N | N | CARLILE | 7115 ft. | | N | N | GREENHORN | 7166 ft. | | N | N | J SAND | 7510 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/2/2022 Interval Top: 7514 ft. Interval Bottom: 7562 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/17/2001 | Choke Size: | 0.281 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | PLUNGER 500 | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/26/2001 | Treatment Summary: | FRAC'D J SAND W/504020# 20/40 MESH; 208614 GAL GELLED FLUID J SAND PERFS: 7514' - 7562' COMMINGLED WITH NB-CD |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7124 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/17/2001 | Test Method: | PLUNGER 500 | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 9 | CALC_BBLS_OIL | 9 | CALC_GOR | 51111 | CALC_MCF_GAS | 460 | CASING_PRESS | 500 | GRAVITY_OIL | 60 | MCF_GAS | 460 | TUBING_PRESS | 625 |
| Perforation Data: | Interval Top: | 7514 ft. | # Of Holes: | | Interval Bottom: | 7562 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/17/2001 Interval Top: 6887 ft. Interval Bottom: 7562 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | 0.281 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | PLUNGER | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/26/2001 | Treatment Summary: | FRAC'D J SAND W/ 504020 # 20/40 MESH; 208614 GAL. GELLED FLUID J SAND PERFS 7514'-7562' COMMINGLED WITH NB-CD |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7124 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/17/2001 | Test Method: | PLUNGER | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 9 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 9 | CALC_GOR | 51111 | CALC_MCF_GAS | 460 | CASING_PRESS | 500 | GRAVITY_OIL | 60 | MCF_GAS | 460 | TUBING_PRESS | 625 |
| Perforation Data: | Interval Top: | 6887 ft. | # Of Holes: | | Interval Bottom: | 7562 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/2/2022 Interval Top: 6887 ft. Interval Bottom: 7106 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/23/1994 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/26/2001 | Treatment Summary: | FRACD CDL/NB W/ 41200)# 20/40 MESH SAND PLUS 108449 GALS GELLED FLUID |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7082 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/28/1994 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 10 | CALC_GOR | 26500 | CASING_PRESS | 2400 | GRAVITY_OIL | 60 | MCF_GAS | 265 | TUBING_PRESS | 1800 |
| Perforation Data: | Interval Top: | 6887 ft. | # Of Holes: | | Interval Bottom: | 7106 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 11/02/2022 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|