|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/28/2017 Measured TD: 8585 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/28/2017 | Wellbore Permit | DRIFTED | Permit #: | 19931894 | Expiration Date: | 1/13/1995 | Proposed Depth/Form: | 8585 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: N2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 499 , Unit Acreage: 320, Drill Unit: N2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-66 , Unit Acreage: 320, Drill Unit: N2 |
| | |
Wellbore Completed | Completion Date: | 2/17/1995 | Spud Date: | 12/10/1993 | Spud Date Is: | ACTUAL | Measured TD: | 8585 ft. | Measured PB depth: | 0 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | DIS, NGRS, FDL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 702 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 490, Top: 0 ft., Bottom: 702 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8631 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 420, Top: 6420 ft., Bottom: 8631 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4063 ft. | | | | BENTONITE | 4955 ft. | | | | SHANNON | 5214 ft. | | | | NIOBRARA | 7492 ft. | | | | FORT HAYS | 7876 ft. | | | | CODELL | 7896 ft. | | | | GREENHORN | 7950 ft. | | | | J SAND | 8326 ft. | | | | DAKOTA | 8490 ft. | | | | LAKOTA | 8580 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 8/28/2017 Interval Top: 8338 ft. Interval Bottom: 8358 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/24/1994 | Choke Size: | 0.125 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/17/1995 | Treatment Summary: | FRAC W/ 580,000# 20/40 M IN 171,600 GAL GEL |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7493 ft. | Tubing Packer Depth: | 7937 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/25/1994 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
CASING_PRESS | 880 | MCF_GAS | 1142 | TUBING_PRESS | 780 |
| Perforation Data: | Interval Top: | 8338 ft. | # Of Holes: | 80 | Interval Bottom: | 8358 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/3/2004 Interval Top: 7519 ft. Interval Bottom: 8358 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/17/1995 | Treatment Summary: | REL RBP. POOH, RIH W/PRODUCTION TBG. LAND EOT @ 8315'. SWAB. TURN WELL OVER TO PRODUCTION. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8315 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/3/2004 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 1 | CALC_BBLS_H2O | 1 | CALC_BBLS_OIL | 1 | CALC_GOR | 66000 | CALC_MCF_GAS | 66 | CASING_PRESS | 450 | MCF_GAS | 66 | TUBING_PRESS | 300 |
| Perforation Data: | Interval Top: | 7519 ft. | # Of Holes: | 95 | Interval Bottom: | 8358 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/28/2017 Interval Top: 7519 ft. Interval Bottom: 7909 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/17/1995 | Choke Size: | 0.188 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/17/1995 | Treatment Summary: | ACIDIZE W/ 1,000 GAL 10% HCL & 1,000 GAL 15% HCL & FRAC W/ 450,000# 20/40 M IN 127,344 GAL GEL |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7493 ft. | Tubing Packer Depth: | 7937 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/26/1995 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 16 | BBLS_OIL | 32 | CALC_GOR | 6250 | CASING_PRESS | 160 | MCF_GAS | 200 |
| Perforation Data: | Interval Top: | 7519 ft. | # Of Holes: | 15 | Interval Bottom: | 7909 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 08/28/2017 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|